Ayrfield, Dublin

1 unique commencement event · latest notified commencement 19 Mar 2019 · planning basis not stated

Unique commencement events
1
Latest notified commencement
19 Mar 2019
Latest notice
150 units
Planning references supplied
None stated
Public location
Ayrfield, Dublin

Public source geography

Site location

Public site / locality
Ayrfield, Dublin
County
Dublin

Public site labels seen across the notices

  • roof level
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0049623DC BCMS open-data feed

Proposed residential development on 1.53 hectares of land to consist of : i) 150 no. apartment units and associated car parking comprising (a) 50 no. 1 bed units, (b) 81 no. 2 bed units and (c) 19 no. 3 bed units; (ii) 1 no. crèche facility of 594sqm with potential for community use until such time as crèche becomes viable; (iii) 3 no. office/commercial buildings with a total floor area of 152.6sqm with 1 no. of these units dedicated for community use; (iv) renewable energy design measures externally to the building at roof level; (v) 0.31 hectares of public open space with provision for a multi-use games area (MUGA) and perimeter fencing; (vi) temporary access from Belmayne Road until such a time as the adjoining residential development of Belmayne to the east has been taken in charge and access from Churchwell Avenue can be provided; (vii) ESB substation; (viii) temporary construction signage; (ix) estate signage; (x) site perimeter boundary treatment to the north and west with temporary fencing to the south until such a time as remainder of land is developed; and (xi) all associated site works. The height of the proposal ranges from 5 to 6 storeys to the west (Malahide Road); 4 to 5 storeys to the east; 4 to 6 storeys to the north; and 3 to 5 storeys to the south. Part of the development is over basement.

Work stated for this notice 150 units Explicit phase quantity stated by the source.

Floor area stated for this source: 19,359 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.