Commencement notice group

Pinewood estate — commencement notices

Tralee, Kerry

16 separate notices · latest notified commencement 23 Mar 2026 · planning reference supplied

Source notices
16
Latest notified commencement
23 Mar 2026
Latest notice
534 m²
Planning references supplied
PART8
Public location
Tralee, Kerry

Public source geography

Site location

Public site / locality
Tralee, Kerry
County
Kerry

Public site labels seen across the notices

  • Cahersiveen, Kerry
  • Fenit, Kerry
  • Listowel, Kerry
  • Ballylongford, Kerry
  • Ardfert, Kerry
  • Killorglin, Kerry
  • 13 additional public site labels

Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referencePART8

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0140140KY BCMS owner-supplied export

Demolition of existing two storey flat roof section to the rear of this building and demolition of existing Public toilets. Construction of two storey extension. Upgrade and conservation works to existing building

534 m² · stated on this notice

Planning reference PART8 Builder stated: Evans and Kelliher Construction Ltd
CN0127223KY BCMS owner-supplied export

The proposed works will include: (a) the construction of a new facility centre for water based activities, (b) the construction of new public realm areas adjacent to the facility, (c) the demolition of existing public toilet block, (d) the provision of traffic

180 m² · stated on this notice

Planning reference PART8 Builder stated: Ned O Shea & Sons Ltd
CN0125255KY BCMS owner-supplied export

Construction of Trailhead facilities building including lighting, landscaping, provision of amenity space for users of the Greenway including seating, bicycle stands, bicycle repair station, drinking water station and all ancillary site works and services.

69 m² · stated on this notice

Planning reference PART8 Builder stated: Parkway Contracts Ltd
CN0107689KY BCMS owner-supplied export

Extension and Refurbishment of No 23 Mitchel’s Road, Tralee, Co. Kerry

1 unit · 53 m² · stated on this notice

Planning reference PART8 Builder stated: Tommie Finnegan Ltd
CN0105314KY BCMS owner-supplied export

The overall project consists of the demolition of an existing dwelling and the construction of two identical apartment blocks; Block A and Block B. This application is in relation to Block A. Block A is a 2 storey building containing 2no. 1 bedroom apartments at ground floor level and 2no. 1 bedroom apartments at first floor level.

4 units · 239 m² · stated on this notice

Planning reference PART8 Builder stated: Evans and Kelliher Construction Ltd
CN0105313KY BCMS open-data feed

The overall project consists of the demolition of an existing dwelling and the construction of two identical apartment blocks; Block A and Block B. This application is in relation to Block B. Block B is a 2 storey building containing 2no. 1 bedroom apartments at ground floor level and 2no. 1 bedroom apartments at first floor level.

4 units · 239 m² · stated on this notice

Planning reference PART8
CN0082979KY BCMS owner-supplied export

7 No. Housing Development at Carraig An Phoill, Ballylongford And associated site works includes : 2 detached units 2 semi detached units 3 terrace units

7 units · 3,067 m² · stated on this notice

Planning reference PART8
CN0047683KY BCMS owner-supplied export

Construction of 4 Bedroom single rural dwelling and associated site works at Owngarry, Killorglin, Co. Kerry

1 home · 108 m² · stated on this notice

Planning reference PART8 Builder stated: Parkway Contracts Ltd
CN0043440KY BCMS owner-supplied export

construction of 3 bedroom Single rural dwelling and associated site works at Meanus, Killorglin, Co.Kerry

1 home · 88 m² · stated on this notice

Planning reference PART8 Builder stated: Parkway Contracts Ltd
CN0042237KY BCMS owner-supplied export

construction of 3 bedroom Single rural dwelling and associated site works at Tulligbeg, Co.Kerry

1 home · 88 m² · stated on this notice

Planning reference PART8
CN0038425KY BCMS owner-supplied export

The construction of 21 No. houses together with associated services and site works

21 homes · 1,223 m² · stated on this notice

Planning reference PART8 Builder stated: Ned O Shea & Sons (Construction) Ltd
CN0035684KY BCMS owner-supplied export

Constructing of 3 bedroom Single dwelling and associated site works at Pinewood estate, Killarney, Co.Kerry

1 home · stated on this notice

Planning reference PART8
CN0034030KY BCMS owner-supplied export

Construction of 22no. dwellings and all acssociated site works at Gortamullin, Kenmare

22 homes · 22 m² · stated on this notice

Planning reference PART8 Builder stated: KPH Construction
CN0033270KY BCMS owner-supplied export

Construction of 3 bedroom Single rural dwelling and associated site works at Cahernaboshina, Ventry, Co.Kerry

1 home · stated on this notice

Planning reference PART8 Builder stated: Inch Construction LTD
CN0032788KY BCMS owner-supplied export

Construction of single rural dwelling and associated site works at Callinafercy, Milltown, Co. Kerry.

1 home · stated on this notice

Planning reference PART8 Builder stated: Tommie Finnegan Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.