Commencement notice group

Commencement notices — Ballyconnell

Ballyconnell, Cavan

1 separate notice · latest notified commencement 04 Jan 2021 · planning reference supplied

Source notices
1
Latest notified commencement
04 Jan 2021
Latest notice
87 m²
Planning references supplied
2093
Public location
Ballyconnell, Cavan

Public source geography

Site location

Public site / locality
Ballyconnell, Cavan
County
Cavan

Public site labels seen across the notices

  • Annagh, Ballyconnell, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2093

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0071839CN BCMS owner-supplied export

Change of use of existing single storey building to use as childcare facility located at Annagh, Ballyconnell, Co.Cavan

87 m² · stated on this notice

Planning reference 2093 Builder stated: JAS Plant Hire & Construction Ltd Developer stated: Ballyconnell Den Development

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.