Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
5 separate notices · latest notified commencement 15 Apr 2021 · planning reference supplied
- Source notices
- 5
- Latest notified commencement
- 15 Apr 2021
- Latest notice
- 106 units
- Planning references supplied
- ABP-305172-19
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin 18, Dublin
- Clay Farm, Ballyogan Road, Dublin 18
- street level at Clay Farm, Ballyogan Road, Dublin 18
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Block E04 - E06, Clay Farm Drive - comprising of a detached four storey apartment building with carpark.
106 units · 13,479 m² · stated on this notice
Block E01 - E03, Clay Farm Drive - comprising of a detached four storey apartment building with community facilities and carpark.
77 units · 8,109 m² · stated on this notice
Block E07 - E09, Clay Farm Drive - comprising of a detached four storey apartment building with carpark.
114 units · 13,462 m² · stated on this notice
Construction of two apartment blocks consisting of 104 apartments in blocks ranging from 4 - 6 storeys above ground floor level. Each block is located above dedicated basement / undercroft car parking. Works include all landscaping, associated site services, enabling works and attenuation to both blocks at Clay Farm, Ballyogan Road, Dublin 18.
104 units · 13,256 m² · stated on this notice
Construction of a Neighbourhood Centre consisting of 28 no. Duplex Units, Childcare facility, and retail units with external plaza area, car parking & associated works at street level at Clay Farm, Ballyogan Road, Dublin 18.
28 units · 4,750 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.