1 separate notice · latest notified commencement 08 Jun 2026 · planning basis not stated

Source notices
1
Latest notified commencement
08 Jun 2026
Latest notice
525 m²
Planning references supplied
None stated
Public location
Dublin 3, Dublin

Public source geography

Site location

Public site / locality
Dublin 3, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0143097DC BCMS owner-supplied export

Changing the existing two training rooms at ground floor into the Arcus Room (multi purpose meeting room) and creating two meeting rooms, a small meeting room, a board meeting room and a CEO office at second floor and all associated M&E services

525 m² · stated on this notice

Builder stated: William Farrell Ltd Developer stated: Oracle EMEA Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.