Commencement notice group
Housing commencement notices — Bennetstown
Bennetstown, Dunboyne, Meath
6 separate notices · latest notified commencement 03 Jun 2026 · planning reference supplied
- Source notices
- 6
- Latest notified commencement
- 03 Jun 2026
- Latest notice
- 14 units
- Planning references supplied
- 24/60805
- Public location
- Bennetstown, Dunboyne, Meath
Public source geography
Site location
- Public site / locality
- Bennetstown, Dunboyne, Meath
- County
- Meath
Public site labels seen across the notices
- Dunboyne, Meath
- Bennetstown, Dunboyne, Co
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not indexed a direct drawings link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 3 & 4 storey residential block comprising of 8 no. apartments and 6 no maisonettes
14 units · 1,288 m² · stated on this notice
Construction of a 3 and 4 storey residential block (BA04) comprising of 8 no. apartments and 6 no. maisonettes.
140 units · 1,288 m² · stated on this notice
Construction of a three storey duplex building (BZ03) containing 16 no. dwellings, together with ancillary bin and bike store.
140 homes · 1,494 m² · stated on this notice
Construction of 1 no. ESB substation which includes a switch room together with site associated works located at Bennetstown, Dunboyne, Co. Meath
21 m² · stated on this notice
Construction of 169 dwellings ranging from 2-3 storey, to gether with associated site works.
169 homes · 15,206 m² · stated on this notice
Construction of a 3 and 4 storey residential block (BA05) comprising of comprising of 10 no. apartments and 8 no. maisonettes.
140 units · 1,658 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.