Commencement notice group
existing wood processing facility — commencement notices
Ballyconnell, Cavan
1 separate notice · latest notified commencement 20 Apr 2020 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 20 Apr 2020
- Latest notice
- 347 m²
- Planning references supplied
- 19466
- Public location
- Ballyconnell, Cavan
Public source geography
Site location
- Public site / locality
- Ballyconnell, Cavan
- County
- Cavan
Public site labels seen across the notices
- existing wood processing facility
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of (a) lean-to extension to side (southwest) of existing factory incorporating offices (147sqm) (b) alterations to existing layout which includes relocating workshop (31sqm) (excludes works carried out to date including removal of walls/first floor, foundations to office extension, relocated canteen (45sqm) and saw workshop (52sqm) (c) change of use of existing office area to retail outlet (47sqm)(excludes alterations carried out to elevations to date)at existing wood processing facility.
347 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.