Commencement notice group
Building extension commencement notices — Celbridge
Celbridge, Kildare
2 separate notices · latest notified commencement 01 May 2026 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 01 May 2026
- Latest notice
- 25 m²
- Planning references supplied
- 24/61211
- Public location
- Celbridge, Kildare
Public source geography
Site location
- Public site / locality
- Celbridge, Kildare
- County
- Kildare
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Conversion of existing attic space comprising of modification of existing roof structure, replace existing hip roof profile with new full gable profile c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
25 m² · stated on this notice
Conversion of existing attic space comprising of modification of existing roof structure, replace existing hip roof profile with new full gable profile c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
25 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.