Commencement notice group
Housing commencement notices — Dublin
Dublin1, Dublin
2 unique commencement events · latest notified commencement 20 Feb 2026 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 20 Feb 2026
- Latest notice
- 2 apartments
- Planning references supplied
- ABP-316290-23
- Public location
- Dublin1, Dublin
Public source geography
Site location
- Public site / locality
- Dublin1, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-316290-23. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Erection of a 3 storey concrete framd multi unit residential block with balconies comprising of 2 duplex units over 2 apartment units and associated site works constructed in a single phase.
Floor area stated for this source: 294 m².
Overall development total stated in source: 4 houses.
Erection of a 3 storey concrete framed multi-unit residential block with balconies comprising of 2 duplex units over 2 apartment units and associated site works constructed in a single phase.
Floor area stated for this source: 294 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.