Commencement notice group
The school — commencement notices
Sandymount, Dublin 4, Dublin
4 separate notices · latest notified commencement 05 Feb 2026 · planning reference supplied
- Source notices
- 4
- Latest notified commencement
- 05 Feb 2026
- Latest notice
- 141 m²
- Planning references supplied
- 4429/19
- Public location
- Sandymount, Dublin 4, Dublin
Public source geography
Site location
- Public site / locality
- Sandymount, Dublin 4, Dublin
- County
- Dublin
Public site labels seen across the notices
- Sandymount, Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The works involve material alterations and change of use to an exising two-storey structure forming part of the overall campus of the Sandymount Educate Together Secondary School (ETSS)
141 m² · stated on this notice
Proposed construction of a 5-storey secondary school. The school will consist of a MU Hall, fitness suite, and associated changing facilities, storage, GP rooms, Standard and specialised classrooms, a library, and a special education area.
11,737 m² · stated on this notice
Site Clearance, Demolition, Site Drainage, foundation removal to formation level and all associated site works. TO Post- Primary Building, No. 14 Seafort Avenue, Gandon Villa & other modular buildings on site
100 m² · stated on this notice
Works are planned as follows: Service isolations, Demolitions including the removal of hard and soft land scaping, Protection of Existing Facades, Removal of foundations and ground to formation levels, Secant piling where piling only forms part of the temporary works, Drainage and drainage diversions to facilitate utilities outside of the building line. No building to be constructed as part of these works.
1 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.