Housing commencement notices — Killeshandra

Killeshandra, Cavan

1 separate notice · latest notified commencement 09 May 2024 · planning reference supplied

Source notices
1
Latest notified commencement
09 May 2024
Latest notice
92 m²
Planning references supplied
2360222
Public location
Killeshandra, Cavan

Public source geography

Site location

Public site / locality
Killeshandra, Cavan
County
Cavan

Public site labels seen across the notices

  • Main Street, Killeshandra, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2360222

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0114861CN BCMS open-data feed

Construct single storey extension to rear of existing commercial unit together with change of use of first floor residential accommodation to offices with alterations to plans, elevations and associated site works at Main Street, Killeshandra, Co. Cavan.

92 m² · stated on this notice

Planning reference 2360222

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.