Commencement notice group

Housing commencement notices — Sutton

Sutton, Dublin

1 unique commencement event · latest notified commencement 08 Dec 2025 · planning basis not stated

Unique commencement events
1
Latest notified commencement
08 Dec 2025
Latest notice
58 m²
Planning references supplied
None stated
Public location
Sutton, Dublin

Public source geography

Site location

Public site / locality
Sutton, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0136490FL BCMS owner-supplied export

Sealawn, Shielmartin Road, Sutton, Dublin 13 (protected structure) renovation to the existing two storey coach house/office with replacement of the existing folding garage doors with glazed screen. Replacement of the corrugated roof covering on the adjoining garage with new pitched slate roof with the addition of solar panels to this roof with ancillary site and servicing works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 58 m².

Builder stated: Celticbaybuilders Ltd Developer stated: Celticbaybuilders Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.