Commencement notice group

Housing commencement notices — Ardee

Ardee, Louth

1 separate notice · latest notified commencement 23 Sep 2019 · planning reference supplied

Source notices
1
Latest notified commencement
23 Sep 2019
Latest notice
159 homes
Planning references supplied
10174AND19336
Public location
Ardee, Louth

Public source geography

Site location

Public site / locality
Ardee, Louth
County
Louth

Public site labels seen across the notices

  • Bridgegate, Rathgory, Ardee
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference10174AND19336

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0056978LH BCMS owner-supplied export

Phase 3 of residential development of 144 units (parent permission) expanded to 159 units by subsequent permissions, at Bridgegate, Rathgory, Ardee. Phase 3 consisting of 15 no. Houses.

159 homes · 1,649 m² · stated on this notice

Planning reference 10174AND19336 Builder stated: Richmond Homes Developer stated: Richmond Homes

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.