Commencement notice group
Housing commencement notices — Dublin
Dublin 3, Dublin
1 separate notice · latest notified commencement 20 May 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 20 May 2026
- Latest notice
- 1 home
- Planning references supplied
- F25A/0674E
- Public location
- Dublin 3, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 3, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The renovation and extension of the existing detached bungalow including: raising the roof of the existing bungalow to create a new first floor/dormer living accommodation and the construction of a small extension to the rear at ground floor level, conversion of the existing garage to domestic use, raising the level of the flat roof to the existing extensions to the rear of the house, the addition of new rooflights to the front of the house, alterations to all of the existing elevations to include the reconfiguration of all windows and doors, external insulation to all walls finished with both composite timber cladding and render, reconfiguration of the internal layouts, along with all associated landscaping, boundary treatments, site services and all associated site works
1 home · 366 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.