Commencement notice group

Housing commencement notices — Killester

Killester, Dublin

1 separate notice · latest notified commencement 11 May 2026 · planning reference supplied

Source notices
1
Latest notified commencement
11 May 2026
Latest notice
41 m²
Planning references supplied
WEB1797/25
Public location
Killester, Dublin

Public source geography

Site location

Public site / locality
Killester, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceWEB1797/25

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0141733DC BCMS owner-supplied export

The proposed development will consist of the change of use of the ground floor from commercial to residential, demolition of existing roof over rear yard, associated boundary walls and single storey rear extension, construction of single storey side extension and new 900mm high front / side boundary walls along with the provision of 2 no. parking spaces.

41 m² · stated on this notice

Planning reference WEB1797/25 Builder stated: AVP Building Services LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.