Commencement notice group
Housing commencement notices — Caherdavin
Caherdavin, Limerick
1 separate notice · latest notified commencement 24 Sep 2019 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 24 Sep 2019
- Latest notice
- 43 units
- Planning references supplied
- 18/8008
- Public location
- Caherdavin, Limerick
Public source geography
Site location
- Public site / locality
- Caherdavin, Limerick
- County
- Limerick
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Limerick City and County Council · reference 18/8008 Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 43 no. dwelling units comprising 15 no. two storey dwellings and 28 no. apartments. The development is split over 3 no. blocks as follows; Block A (two storey): 13 no. houses and 4 no. apartments, Block B (two storey): 2 no. houses and 4 no. apartments, Block C (three storey): 20 no. apartments.
43 units · 74,612 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.