Commencement notice group

Housing commencement notices — Haggardstown

Haggardstown, Louth

1 separate notice · latest notified commencement 19 Apr 2024 · planning references supplied

Source notices
1
Latest notified commencement
19 Apr 2024
Latest notice
142 units
Planning references supplied
306503 · ABP-303891-19
Public location
Haggardstown, Louth

Public source geography

Site location

Public site / locality
Haggardstown, Louth
County
Louth
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference306503
Appeal referenceABP-303891-19

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0114111LH BCMS owner-supplied export

Construction of a strategic housing development consisting of 142 number apartments in five buildings ranging in height from 3-5 storeys and all associated ancillary site work.

142 units · 13,102 m² · stated on this notice

Planning reference 306503 Appeal reference ABP-303891-19 Builder stated: K& J Townmore Construction Developer stated: Marcon Modular Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.