Commencements / complete inventory / Ranked / relevance Index refreshed nightly · 31 Jul 2026

Complete commencement inventory

Every commencement project, and every notice underneath it

The full retained public-safe commencement history, grouped by planning authority and planning reference. Switch to Notices to inspect each source identity and phase separately.

138,265 Projects grouped by planning ref
153,613 Notice identities individual source notices
10,187 Multi-notice projects phased or revised starts
42,039 Named-builder notices builder stated on the notice
138,265 In this window All history · 153,613 notices
Filters Show / hide

Showing 1,826–1,850 of 138,265 projects

New build
28 Jan 2019 · Commenced
1 notice · 1 source identity

7-Day Notice - Construction of new six storey apartment

Clongriffin, Dublin · Dublin City Council · Planning ref 3696/18

7-Day Notice - Construction of new six storey apartment development, comprising 83 no. apartments, in two cores, over a basement car park. Tenant facilities will also be provided on part Ground and Basement levels.
New build
28 Jan 2019 · Commenced
1 notice · 1 source identity

New Development at St — Donore Avenue

Donore Avenue, Dublin · Dublin City Council · Planning ref 2475/18 - Part 8 Development

New Development at St. Teresas Gardens, Donore Avenue, Dublin 8 comprising the construction of 54 residential units comprising 1 No. Apartment Building containing 16 No. apartments; 38 No. Dwelling Houses; 1 No. Ancillary Building; and all associated Site Development Works
New build
28 Jan 2019 · Commenced
1 notice · 1 source identity

38 no dwellings comprising of 12 no — Balbriggan

Balbriggan, Dublin · Fingal County Council · Planning ref F18A/0067

Construction of 38 no dwellings comprising of 12 no. 2 storey semi-detached 3 bed dwellings (Type C) and 26 no. 2 storey semi-detached 3 bed dwellings (Type D) all on a developed site of circa 0.9 ha at 48-54 incl., 69-80 incl. & 95-113 incl. Castleland Park Way, Castleland Park, Balbriggan, Co. Dublin.
New build
16 Jan 2019 · Commenced
1 notice · 1 source identity

Residential development comprising a creche — Arklow

Arklow, Wicklow · Wicklow County Council · Planning ref 08610066 & 18/1033

Residential development comprising a creche; 185 houses with 4 house types; 8 duplex units over 8 apartments; new access/relief road and infrastructure linking Vale Road to Lamberton Avenue; all services and ancillary site development works; relocation of part of existing overhead ESB lines; with temporary effluent treatment plant and sewerage pumping station at Yardland Td
New build
28 Dec 2018 · Commenced
1 notice · 1 source identity

Development consisting of the demolition of all building and

Dublin, Dublin · Dublin City Council · Planning ref 2711/17

Development consisting of the demolition of all building and structures on site (circa 4,065 square metres gross floor area (GFA) and the development of an eight storey (with partial seventh floor level setback for balconies) hotel of circa 10,688 square metres gross floor area (comprising 393 number bedrooms and related hotel facilities including reception area, lounge, kitchen, bin store, switch room and ESB substation) over basement plant level (157 square metres); an eight storey (with partial seventh floor level setback for balconies) aparthotel of circa 5,412 square metres gross floor area (comprising 136 number studios/suites and related aparthotel facilities including reception area, bin store, switch room and ESB substation) over basement plant level (63 square metres); an eight storey (with seventh floor level setback for balconies) aparthotel of circa 2,875 square metres gross floor area (comprising 66 number studios/suites and lobby area) over ground floor restaurant unit (482 square metres) and basement plant level (136 square metres); an eight storey apartment block of circa 2,068 square metres gross floor area comprising 21 number apartment units in a mix of 14 number one bed and 7 number two bed units (with associated enclosed bicycle parking, bin store at ground floor) and ground floor retail unit (110 square metres); plant room and screened plant at roof level. The development will also include: vehicular and pedestrian access via Townsend Street; cycle parking, associated lighting; associated signage; associated site servicing (foul and surface water drainage and water supply); solar panels; the provision of SuDS measures (including attenuation tank below ground and sedum roofs). The scheme also includes: all hard and soft landscaping; boundary treatments; changes in level; and all other associated site excavation and site development works above and below ground on site of circa 0.4 hectares at 44-53 Townsend Street, 33-39 Moss Street, 31-33 Glou
New build
25 Dec 2018 · Commenced
1 notice · 1 source identity

A residential development of 41 dwellings consisting of House

Clonmel, Tipperary · Tipperary County Council · Planning ref 06550157; PL52.227298;

Construction of a residential development of 41 dwellings consisting of House House Type 1: 6 no. 4 bedroom semi detached two storey and half storey units, House Type 2 8 no. 3 bed semi detached 2 storey units, House Type 3. 11 no. 2 bed 2 storey town house, and House Type 4. 16 no. 3 bed 2 storey town houses.
New build
18 Dec 2018 · Commenced
1 notice · 1 source identity

Sruthan an Saili - Willow Brook, Derreen - Construction of 61 No

Killarney, Kerry · Kerry County Council · Planning ref 15765

Sruthan an Saili - Willow Brook, Derreen - Construction of 61 No. dwellings consisting of 14 No. 3 bedroom semi-detached, 2 No. 2 bedroom semi -detached, 9 No. 3 bedroom terrace, 16 No. 3 bedroom terrace (type D), 20 No. 2 bedroom terraced dwellings along with roads, footpaths, green areas and all associated site works and ancillary services
New build
03 Dec 2018 · Latest notice

The remaining 39 units within the Bellingham Scheme, to include

Portlaoise, Laois · Laois County Council · Planning ref 081273

Construction of the remaining 39 units within the Bellingham Scheme, to include site numbers 188- 197, 201-204, 211-214, 224 - 238 and 240 -245.
New build
30 Nov 2018 · Commenced
1 notice · 1 source identity

Phase 2 of the demolition of the existing engineering works

Shanowen Road, Dublin · Dublin City Council · Planning ref 6058/04; 5442/06; 6058/04/x1; 6058/04/x2; 6058/04/x3

Phase 2 of the demolition of the existing engineering works buildings and the construction of a residential development and ancillary accomodation, including day nursery / creche facility of 419.6sqm, car parking, ESB substations and plant and including site development works and landscaping, all on a site of 1.90 hectares on the site of the former engineering works, bounded to the north by Shanowen Road, to the east by St. Kevins Boys Club and to the west by Shanowen Business Park, Shanowen Road, Santry, Dublin 9. The development comprises a total of 330 no. apartments and duplex units in 6 no. apartment blocks varying in height from 3 storey to 7 storey, all over basement and set around a series of interconnecting courtyards; all apartments and duplex units have a private patio or balcony area and all blocks have roof terraces. Block A to the south-west of the site containing 6 no. 1 bed and 26 no. 2 bed apartments in 5 storeys over basement : Block B to the west of the site containing 10 no. 2 bed duplex units, 6 no. 1 bed, 24 no. two bed and 6 no. 3 bed apartments in 6 storeys over basement with the top floor recessed : Block C fronting onto Shanowen Road containing 8 no. 2 bed duplex units, 4 no. 1 bed apartments, 19 no. 2 bed and 8 no. 3 bed apartments in 6 storeys over basement, with the top floor recessed : Block D containing 10 no. 1 bed, 38 no. 2 bed and 4 no. 3 bed apartments varying in height from 3 to 6 storeys over basement, with the top floor recessed : Block E fronting onto Shanowen Road containing 4 no. 2 bed duplex units, 4 no. 1 bed, 73 no. 2 bed and 8 no. 3 bed apartments varying in height between 3 and 7 storeys over basement, with the top floors recessed : Block F containing a creche facility of 419.6sqm at ground floor level with direct access from Shanowen Road, 10 no. 2 bed duplex units, 12 no. 1 bed, 38 no. 2 bed and 12 no. 3 bed apartments in 6 storeys over basement, with the top floor recessed. The basement area contains 416 no. car parki
New build
23 Nov 2018 · Commenced
1 notice · 1 source identity

Inis Fáil Bandon - Construction of 30 no

Bandon, Cork · Cork County Council · Planning ref 176320

Inis Fáil Bandon - Construction of 30 no. dwelling houses(1-30) and all ancillary site development works. The proposed development consists of 6 no. 4 bedroom semi- detached houses, 12 no. 3 bedroom semi-detached houses, 6 no. 3 bedroom townhouses, 3 no. 2 bedroom townhouses and 3 no. 2 bedroom bungalows. Ancillary site development works include the demolition of partial structures of housing units constructed on foot of 05/2858. Access to the proposed development will be provided via a new entrance from Convent Hill.
New build
15 Nov 2018 · Commenced
1 notice · 1 source identity

322 no — Spencer Dock

Spencer Dock, Dublin · Dublin City Council · Planning ref DSDZ2896/18

Construction of 322 no. residential units and apart hotel in 2 no. blocks at City Block 2, Spencer Dock, Dublin 1
New build
07 Nov 2018 · Commenced
1 notice · 1 source identity

24 no dwelling in 2 storey units on lands zoned for residential

Swords, Dublin · Fingal County Council · Planning ref PartXI/007/16

Construction of 24 no dwelling in 2 storey units on lands zoned for residential use. There are 20 no two storey houses and 4 no apartments own door access.
New build
31 Oct 2018 · Commenced
1 notice · 1 source identity

40 new houses and site development works — Kinsale

Kinsale, Cork · Cork County Council · Planning ref Housing at Ballynacubby/Cappagh

40 new houses and site development works
New build
29 Oct 2018 · Commenced
1 notice · 1 source identity

26 dwellings at Greystones Harbour, Greystones, Co Wicklow

Greystones, Wicklow · Wicklow County Council · Planning ref 27JA0029 (18371)

Construction of 26 dwellings at Greystones Harbour, Greystones, Co Wicklow
New build
29 Oct 2018 · Commenced
1 notice · 1 source identity

8 No dwellings 13-20 Gleann Alainn, Doween, Rosscarbery, Co

Rosscarbery, Cork · Cork County Council · Planning ref 10/807 & 17/82

Construction of 8 No dwellings 13-20 Gleann Alainn, Doween, Rosscarbery, Co. Cork and all associated site works
New build
19 Oct 2018 · Commenced
1 notice · 1 source identity

81 No — Dublin 15

Dublin 15, Dublin · Fingal County Council · Planning ref FW17A/0110

Construction of 81 No. 2 and 3 storey dwellings consisting of detached, semi-detached and terrace units, house numbers 1-12 & 14-54 inclusive Fairhaven Walk and 27-54 Phoenix Park Avenue, Former Phoenix Park Racecourse, Castleknock Road, Dublin 15.
New build
16 Oct 2018 · Commenced
1 notice · 1 source identity

78 No — Balbriggan

Balbriggan, Dublin · Fingal County Council · Planning ref F18A/0266

Construction of 78 No. Two Storey Dwellings in Phase 2 of a residential development on Lands off the Naul Road, Balbriggan, Co. Dublin.
New build
12 Oct 2018 · Commenced
1 notice · 1 source identity

Nos — Oldtown

Oldtown, Swords, Dublin · Fingal County Council · Planning ref F17A/0687

The construction of Nos. 65-75(odds) Park Avenue, 27-41(odds) & 45 Miller's Avenue, 62-80 (evens) & 83-99 (odds) Longview Avenue, 14-41 (consecutive) Meadowbank Road, 1-17 (odds) & 2-30 (evens) Meadowbank Mews, 2-12 (evens) Meadowbank Lane, Miller's Glen, Oldtown, Swords, Co. Dublin.
New build
03 Oct 2018 · Commenced
1 notice · 1 source identity

28 no — Sligo

Sligo, Sligo · Sligo County Council · Planning ref Part 8 Planning Permission

Construction of 28 no. Social Housing Dwellings, together with drainage and all associated site works at Knappagh Road, Knappagh Beg, Sligo.
New build
17 Sep 2018 · Commenced
1 notice · 1 source identity

7-Day Notice - Construction of new six storey apartment

Clongriffin, Dublin · Dublin City Council · Planning ref 4266/16

7-Day Notice - Construction of new six storey apartment development, comprising 133 no. apartments, in three blocks, over a common basement car park.
New build
03 Sep 2018 · Commenced
1 notice · 1 source identity

The completion of the existing basement car park and storage

Kilkenny, Kilkenny · Kilkenny County Council · Planning ref PL.10.247834

The completion of the existing basement car park and storage area The construction of Building A which is a 4-storey building constructed over the basement carpark and comprises of 19 No. residential apartments and associated land lord areas The construction of Building B which is a 3-storey building constructed over the basement carpark and comprises of 8 No. apartments, office accommodation and a single storey community centre including associated landlord area and storage
New build
03 Sep 2018 · Commenced
1 notice · 1 source identity

Commencement of Phase 1, incorporating 50 Units at Berford

Duleek, Meath · Meath County Council · Planning ref LB/170362

Commencement of Phase 1, incorporating 50 Units at Berford, Station Road, Duleek, Co. Meath.
New build
28 Aug 2018 · Commenced
1 notice · 1 source identity

15 units (nos — Dundalk

Dundalk, Louth · Louth County Council · Planning ref 18181

Construction of 15 units (nos. 1, 2, 16-28) Cois Cuain, Upper Point Road, Dundalk, Co. Louth
New build
20 Aug 2018 · Latest notice

32 Number Dwellings which includes 32 Number 3 Bedroom Semi

Bettystown, Meath · Meath County Council · Planning ref SA/130855

Construction of 32 Number Dwellings which includes 32 Number 3 Bedroom Semi - Detached, on Site Numbers 54 - 61, 86 - 93, & 110 - 125 and all associated site works.
New build
10 Aug 2018 · Commenced
1 notice · 1 source identity

Rushbrooke Housing Ringmeen - Construction of a residential

Cobh, Cork · Cork County Council · Planning ref 176764

Rushbrooke Housing Ringmeen - Construction of a residential development comprising 56no. (No's 1-56) semi-detached dwellings (46 no. two-storey and 10 no. part two-storey/part three storey split level dwellings, of which 43no. are 3-bed (optional 2-bed) and 13no. are 4-bed). The proposed development will also consist of all associated site development works, drainage and landscaping, as well as a new access from the public road. The proposed development is within the curtilage of 4 Norwood Villas, a Protected Structure (RPS No.21) Knockeven House, a Protected Structure (RPS No. 28), and Sacred Heart Convent and Lodge, Protected Structure (RPS Nos. 31,32,33 and 34).

Counting and privacy. A notice identity is one public source-family/reference pair. Projects group only where canonical planning authority and planning reference match. Highest notice-stated units and floor area are shown; phases are never summed. Personal names, contact details, Eircodes and raw private addresses remain outside this public projection.