New build
30 Jun 2022 · Latest notice
2 notices · phased
Mallow, Cork · Cork County Council · Planning ref 16/6949 ABP-301221-18
Construction of 72 new dwelling houses and associated site works, nos. 103-128, 145-154 & 161-196, 72all inclusive, Clomore, Ballyviniter Lower, Mallow, Co. Cork.
Notice-stated scale
72 units · 8,734 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0090947CC BCMS open-data feed
Construction of 72 new dwelling houses and associated site works, nos. 103-128, 145-154 & 161-196, 72all inclusive, Clomore, Ballyviniter Lower, Mallow, Co. Cork.
72 units · 8,734 m²Builder not named
30 Jun 2022
CN0085587CC BCMS owner-supplied export
Construction 34 no. new dwelling houses and associated site works, nos. 91 to 102 inclusive, nos. 129 to 144 inclusive, nos. 155 to 160 inclusive, Clonmore, Ballyviniter Lower, Mallow, Co. Cork.
34 units · 4,326 m²Builder not named
04 Feb 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Jun 2022 · Latest notice
3 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP30642120
Construction of a New Residential Development consisting of 101no. Apartments, across 7 Blocks arranging from 2/3 to 4 storeys, over a single level basement car park, at lands adjacent to Castlepark School, Castlepark, Castlepark Road and Castle Close, Dalkey, Co. Dublin.
Notice identity Works stated Scale Commenced
CN0090536DR BCMS owner-supplied export
Construction of a new single storey Gym building, at lands adjacent to Castlepark School, Castlepark, Castlepark Road and Castle Close, Dalkey, Co. Dublin.
113.2 m²Builder named
20 Jun 2022
SN0005732DR BCMS open-data feed
Construction of a New Residential Development consisting of 101no. Apartments, across 7 Blocks arranging from 2/3 to 4 storeys, over a single level basement car park, at lands adjacent to Castlepark School, Castlepark, Castlepark Road and Castle Close, Dalkey, Co. Dublin.
101 units · 9,544.6 m²Builder not named
02 Dec 2020
CN0066430DR BCMS open-data feed
Site clearance, to include commencement of excavation works, wall stabilisation, site set up and hoarding for future residential development adjacent to Castlepark School, Castle Park Road and Castle Close, Dalkey, County Dublin.The full development works will be the subject of a subsequent Commencement Notice with Documentation. PLEASE NOTE; the 'erection of a new building' designation under 'Project Assessment' is an inaccurate description of these excavation works, however there was no other more suitable option available on system.
13,000 m²Builder not named
17 Jul 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Jun 2022 · Latest notice
3 notices · phased
Waterford, Waterford · Waterford City and County Council · Planning ref 18778
Construction of 73 new dwelling houses comprising of: 4 no. 2 storey 4 bedroom Detached units; 62 no. 2 storey 3 bedroom Semi-detached units; 2 no. 2 storey 3 bedroom terrace units and 5 no. 2 storey 2 bedroom terrace units.
Notice identity Works stated Scale Commenced
CN0090418WD BCMS owner-supplied export
Construction of 73 new dwelling houses comprising of: 4 no. 2 storey 4 bedroom Detached units; 62 no. 2 storey 3 bedroom Semi-detached units; 2 no. 2 storey 3 bedroom terrace units and 5 no. 2 storey 2 bedroom terrace units.
62 units · 2,790 m²Builder named
13 Jun 2022
CN0085051WD BCMS open-data feed
Construction of 73 new dwelling houses comprising of: 4 no. 2 storey 4 bedroom Detached units; 62 no. 2 storey 3 bedroom Semi-detached units; 2 no. 2 storey 3 bedroom terrace units and 5 no. 2 storey 2 bedroom terrace units.
33 units · 3,463 m²Builder not named
18 Jan 2022
CN0062494WD BCMS open-data feed
Construction of 73 new dwelling houses comprising of: 4 no. 2 storey 4 bedroom Detached units; 62 no. 2 storey 3 bedroom Semi-detached units; 2 no. 2 storey 3 bedroom terrace units and 5 no. 2 storey 2 bedroom terrace units.
14 units · 7,735 m²Builder not named
12 Mar 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Jun 2022 · Latest notice
4 notices · phased
Hansfield Wood, Dublin · Fingal County Council · Planning ref FW18A/0110
Construction of four apartment blocks over a shared basement
Notice identity Works stated Scale Commenced
CN0090206FL BCMS owner-supplied export
Fit out an existing vacant ground floor unit within apartment Block C2 for the use as a creche facility
325 m²Builder named
03 Jun 2022
SN0007122FL BCMS open-data feed
Construction of four apartment blocks over a shared basement
616 units · 21,148 m²Builder not named
14 Apr 2022
SN0005531FL BCMS open-data feed
The construction of a new residential scheme consisting of 5 Apartment Blocks ranging from 2 to 5 storeys over common basement carpark
159 units · 21,525 m²Builder not named
08 Sep 2020
SN0004749FL BCMS open-data feed
Construction of 198 Residential Apartments and 4 Commercial Units Hansfield
198 units · 25,828.8 m²Builder not named
16 Oct 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 May 2022 · Latest notice
3 notices · phased
Dublin 8, Dublin · Dublin City Council · Planning ref 2682/20
Construction of the Residential Blocks D & E at the proposed Kevin Street Redevelopment, at the former DIT Kevin Street Campus, Dublin 2. (AKA Camden Yard) (The works consist of the construction of Residential Blocks D & E, and the common basement levels below the residential scheme including the construction of the areas, indicated as areas “A” & “B” on the Residential Fire Safety Certificate application, to be future incorporated into the lower ground floor of the commercial scheme (commenced under separate commencement notice BCMS Ref 8476492). The Creche and retail/café areas at ground floor will be completed to a shell & core finish with the full fit out of these areas to be undertaken by the future tenants. The commenced works also include works to the party (gable) wall of the adjacent 29 New Bride Street.
Notice-stated scale
299 units · 37,723 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0088995DC BCMS open-data feed
Construction of the Residential Blocks D & E at the proposed Kevin Street Redevelopment, at the former DIT Kevin Street Campus, Dublin 2. (AKA Camden Yard) (The works consist of the construction of Residential Blocks D & E, and the common basement levels below the residential scheme including the construction of the areas, indicated as areas “A” & “B” on the Residential Fire Safety Certificate application, to be future incorporated into the lower ground floor of the commercial scheme (commenced under separate commencement notice BCMS Ref 8476492). The Creche and retail/café areas at ground floor will be completed to a shell & core finish with the full fit out of these areas to be undertaken by the future tenants. The commenced works also include works to the party (gable) wall of the adjacent 29 New Bride Street.
299 units · 21,670 m²Builder not named
09 May 2022
SN0007009DC BCMS open-data feed
[Fire Safety Certificate Application for the] Construction of the Commercial Blocks A, B & C at the proposed Kevin Street Redevelopment, at the former DIT Kevin Street Campus, Dublin 2. (AKA Camden Yard) (The works consist of the construction of commercial office Blocks A, B and C and the common basement levels below the commercial scheme, including the incorporation into the commercial lower ground floor of the areas (indicated as areas “A” & “B” on the Residential Fire Safety Certificate application) within the footprint of the adjacent residential scheme (to be commenced and to be constructed under separate commencement notice BCMS Ref 8475366). Block B also incorporates at ground floor an area that will be an extension of the adjacent existing DCC Library, that will be constructed as part of Block B, with the fit out of the library extension area to be undertaken under separate statutory processes.
37,723 m²Builder not named
07 Mar 2022
CN0086277DC BCMS owner-supplied export
Camden Yard (Former Kevin Steet TUD) - Works associated with the construction of new residential buildings (Blocks D & E) & commercial buildings (Block A, B & C); to include the following: (1) Secant & contiguous piling and associated capping beams, anchors and propping to the perimeter of the residential and commercial basements. (2) Bulk dig works (including archaeological excavation) from ground level (approx. 12mOD – 14mOD) to varying depths (down to approx. 0mOD) and preparation of the site for the residential and commercial basements and structures.
299 units · 1 m²Builder not named
23 Feb 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Apr 2022 · Latest notice
3 notices · phased
Adamstown, Dublin · South Dublin County Council · Planning ref SDZ19A/0011
At Tandy's Lane Village, the construction of 214 no. houses with 208 in terraces and 6 no. detached. 45 are 3-storey and 169 are 2-storey. All are of timber frame construction with concrete ground floors and tiled pitched roofs.
Notice identity Works stated Scale Commenced
CN0088714SD BCMS open-data feed
At 1-16 Tandy's Plaza, Tandy's Lane, Adamstown, Lucan, Co. Dublin, the construction of 8 duplex apartments over 8 ground floor apartments in a 3-storey building of concrete, masonry and timber frame construction.
16 units · 1,597 m²Builder not named
25 Apr 2022
CN0086562SD BCMS owner-supplied export
At 1-15 Tandy's House, Tandy's Lane, Adamstown, Lucan, Co. Dublin, the construction of 15 apartments in a 5-storey building of concrete and masonry construction.
15 units · 1,525 m²Builder named
07 Mar 2022
CN0076270SD BCMS open-data feed
At Tandy's Lane Village, the construction of 214 no. houses with 208 in terraces and 6 no. detached. 45 are 3-storey and 169 are 2-storey. All are of timber frame construction with concrete ground floors and tiled pitched roofs.
214 units · 27,007 m²Builder not named
14 May 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
15 Apr 2022 · Latest notice
2 notices · phased
Drogheda, Meath · Meath County Council · Planning ref LB200403
PH#6 AVOURWEN,CONSTRUCTION OF (19-23) THE OAKS, (26-35) THE PINES & (33-72) THE LAURELS
Notice-stated scale
55 units · 6,456.7 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0088363MH BCMS open-data feed
PH#6 AVOURWEN,CONSTRUCTION OF (19-23) THE OAKS, (26-35) THE PINES & (33-72) THE LAURELS
55 units · 6,456.7 m²Builder not named
15 Apr 2022
CN0084354MH BCMS open-data feed
PHASE#6 AVOURWEN - CONSTRUCTION OF 1-18 THE OAKS
18 units · 2,250 m²Builder not named
16 Dec 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 Mar 2022 · Latest notice
4 notices · phased
Galway, Galway · Galway City Council · Planning ref 19112
Phase 1, Ground works & raft foundation of 64 no. residential units. The development will consist of 25 no. two, three and four bedroom 2 storey dwelling houses, 39 no. one, two and three bedroom apartments in four separate 3 storey blocks, diversion of existing watermain through site, with sewer and water connection to adjacent services together with access/egress off Letteragh Road together with all associated site works and services at Letteragh, Galway City.
Notice-stated scale
64 units · 42,240.8 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0087770GY BCMS open-data feed
An Cnocan Glas Development at Letteragh Road, Galway. Development relates to 25 number houses and 39 number Apartments (over 4 Blocks). This Commencement Notice relates only to Duplex Apartment Blocks B, C, D & Associated Siteworks.
29 units · 2,453 m²Builder not named
29 Mar 2022
CN0085989GY BCMS open-data feed
Phase 3 Construction of 3 Storey Duplex Block A which consists of 2 no. three bedroom, 2 no. one bedroom and 6 no. two bedroom flats together with all associated site works and services.
10 units · 3,226.5 m²Builder not named
18 Feb 2022
CN0071904GY BCMS open-data feed
Phase 2 Construction of 25 no. two three and four bedroom 2 storey dwelling houses together with all associated site works and services.
25 units · 2,849.0 m²Builder not named
08 Jan 2021
CN0065947GY BCMS open-data feed
Phase 1, Ground works & raft foundation of 64 no. residential units. The development will consist of 25 no. two, three and four bedroom 2 storey dwelling houses, 39 no. one, two and three bedroom apartments in four separate 3 storey blocks, diversion of existing watermain through site, with sewer and water connection to adjacent services together with access/egress off Letteragh Road together with all associated site works and services at Letteragh, Galway City.
64 units · 42,240.8 m²Builder not named
09 Jul 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
21 Mar 2022 · Latest notice
2 notices · phased
Malahide, Dublin · Fingal County Council · Planning ref F19A/0557
Construction of 41 No. dwelling houses at 1-36 and 51-55 inclusive Kinsealy Lane, Malahide Co. Dublin.
Notice identity Works stated Scale Commenced
CN0087516FL BCMS owner-supplied export
Proposed construction of a three-storey residential block comprising of 7no. GF Duplex units with 7no. two-storey duplex units overhead at Kinsealy Lane, Malahide, Co.Dublin.
14 units · 525 m²Builder named
21 Mar 2022
CN0072201FL BCMS open-data feed
Construction of 41 No. dwelling houses at 1-36 and 51-55 inclusive Kinsealy Lane, Malahide Co. Dublin.
41 units · 5,187 m²Builder not named
26 Jan 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Mar 2022 · Latest notice
3 notices · phased
Adamstown Castle, Dublin · South Dublin County Council · Planning ref SDZ20A/0017
The construction of 159 houses on lands at Aderrig, Adamstown, Lucan, Co. Dublin.
Notice-stated scale
159 units · 19,140 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0006999SD BCMS open-data feed
At 1-38 Aderrig Square, Adamstown, Co. Dublin, the construction of 38 apartments in one building of concrete and masonry construction.
38 units · 3,164.8 m²Builder not named
07 Mar 2022
SN0006538SD BCMS open-data feed
The construction of a 4-storey apartment building comprising 38 apartments of primarily masonry/concrete construction, at 1-38 Airlie Park View, Adamstown, Co. Dublin.
38 units · 3,164.8 m²Builder not named
27 Sep 2021
CN0078123SD BCMS open-data feed
The construction of 159 houses on lands at Aderrig, Adamstown, Lucan, Co. Dublin.
159 units · 19,140 m²Builder not named
30 Jun 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Mar 2022 · Latest notice
2 notices · phased
Palmerstown, Dublin 20., Dublin · South Dublin County Council · Planning ref SHD3ABP-307092-20
The construction of Block C containing 47 number apartments comprising of 30 number one-bed and 17 number two-beds, in a building six storeys over basement in height, • Block D containing 67 number apartments comprising of 33 number one-bed and 34 number two-beds, in a building seven storeys over basement in height, • Block E containing 63 number apartments comprising of 40 number one-bed and 23 number two-beds, in a building eight storeys over basement in height, and all associated site works
Notice identity Works stated Scale Commenced
SN0007000SD BCMS open-data feed
The construction of Block C containing 47 number apartments comprising of 30 number one-bed and 17 number two-beds, in a building six storeys over basement in height, • Block D containing 67 number apartments comprising of 33 number one-bed and 34 number two-beds, in a building seven storeys over basement in height, • Block E containing 63 number apartments comprising of 40 number one-bed and 23 number two-beds, in a building eight storeys over basement in height, and all associated site works
177 units · 13,220 m²Builder not named
04 Mar 2022
CN0077621SD BCMS owner-supplied export
Construction of an ESB Substation forming part of a residential development at Kennelsfort Road Lower, Palmerstown, Dublin 20
14 m²Builder named
18 Jun 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Feb 2022 · Latest notice
2 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SHD3ABP-303803-19
Phase 2 of 2 Block B & C & development site : Block B consists of a part 6/ part 9 storey block comprising of apartments, residential amenities and retail units.Block C consists of an 8 storey block comprising a crèche & apartments at 5A-C Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
Notice-stated scale
153 units · 13,252 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0006897SD BCMS open-data feed
Phase 2 of 2 Block B & C & development site : Block B consists of a part 6/ part 9 storey block comprising of apartments, residential amenities and retail units.Block C consists of an 8 storey block comprising a crèche & apartments at 5A-C Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
153 units · 13,252 m²Builder not named
07 Feb 2022
SN0006593SD BCMS open-data feed
Phase 1 of 2 consisting of a single storey basement and for a six storey residential block above (Block A)at Units 5A-C Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
43 units · 6,415 m²Builder not named
15 Oct 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
01 Feb 2022 · Latest notice
3 notices · phased
Athenry, Galway · Galway County Council · Planning ref 18/12
Construction and completion of 52 No. houses connecting to previously constructed Phase 1 of existing residential development. Consisting of full construction of house no.7 to 32, 37 to 56. Completion of house no. 57 to 62 and 64 to 67 on previously constructed raft foundation and all associated site development works.
Notice-stated scale
52 units · 5,124.1 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0085598GC BCMS open-data feed
Construction and completion of 6 No. houses connecting to previously constructed Phase 1 & Phase 2 of existing residential development. Consisting of construction of house type A no.33, 34, 63 & 68.Construction of house type D no. 35 & 36 and all associated site development works.
6 units · 550.9 m²Builder not named
01 Feb 2022
CN0077871GC BCMS open-data feed
Construction and completion of 52 No. houses connecting to previously constructed Phase 1 of existing residential development. Consisting of full construction of house no.7 to 32, 37 to 56. Completion of house no. 57 to 62 and 64 to 67 on previously constructed raft foundation and all associated site development works.
52 units · 5,124.1 m²Builder not named
25 Jun 2021
CN0071354GC BCMS owner-supplied export
Construction of Construction phase access with site clearance and Site development works in preparation for construction of housing development
1,000 m²Builder not named
18 Dec 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
31 Jan 2022 · Latest notice
2 notices · phased
Wicklow, Wicklow · Wicklow County Council · Planning ref 21/411
Phase 2:Housing Units 22-30 Vartry Avenue, 1-32 Vartry Close & 35-49 Vartry Close Tinakilly Park, Rathnew, Co. Wicklow
Notice identity Works stated Scale Commenced
CN0085888WW BCMS open-data feed
Phase 2:Housing Units 22-30 Vartry Avenue, 1-32 Vartry Close & 35-49 Vartry Close Tinakilly Park, Rathnew, Co. Wicklow
56 units · 7,562.4 m²Builder not named
31 Jan 2022
CN0084719WW BCMS owner-supplied export
[Phase 1b: Housing Units 16-21 Vartry Avenue] Tinakilly Park, Rathnew, Co. Wicklow
6 units · 744.5 m²Builder named
30 Nov 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
31 Jan 2022 · Latest notice
4 notices · phased
Maynooth, Kildare · Kildare County Council · Planning ref 18 / 762
Construction of 45 dwelling houses and associated site development works at Mullen Park [ The Drive, The Close, The Grove] Greenfield Maynooth Co. Kildare.
Notice identity Works stated Scale Commenced
CN0085934KE BCMS owner-supplied export
The construction of a two storey creche building with associated site development works.
380 m²Builder named
31 Jan 2022
CN0062121KE BCMS open-data feed
Maisonette Units - Nos 1, 3, 5 + 7 The Crescent [Phase Two] - Mullen Park Maynooth, Co.Kildare.
4 units · 192 m²Builder not named
02 Mar 2020
CN0060473KE BCMS open-data feed
Construction of 45 dwelling houses and associated site development works at Mullen Park [ The Drive, The Close, The Grove] Greenfield Maynooth Co. Kildare.
45 units · 5,297.7 m²Builder not named
13 Jan 2020
CN0058162KE BCMS open-data feed
Construction of 44 dwelling houses and associated site development works at Mullen Park [The Drive, The Lawn, The Crescent] Greenfield, Maynooth, Co. KIldare.
44 units · 5,531.2 m²Builder not named
28 Oct 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Dec 2021 · Latest notice
2 notices · phased
Tramore, Waterford · Waterford City and County Council · Planning ref 11/383 & 18/8
Construction of 22no two storey dwelling houses
Notice-stated scale
22 units · 66,000 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0084524WD BCMS open-data feed
Dwelling Houses at Cliffside, Newtown Glen Tramore Co Waterofrd (units 1-7incl)
7 units · 840 m²Builder not named
19 Dec 2021
CN0048584WD BCMS open-data feed
Construction of 22no two storey dwelling houses
22 units · 66,000 m²Builder not named
20 Feb 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Dec 2021 · Latest notice
2 notices · phased
Santry, Dublin · Fingal County Council · Planning ref SHD/015/19
Commencement at Northwood Avenue, Santry, Dublin 9. consisting of 330 number apartments, associated shared services consisting of multi-function area, gym and concierge area, childcare facility and five number ground floor mixed use commercial units (shell only), basement ancillary/parking and associated works.
Notice-stated scale
330 units · 30,811 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0084402FL BCMS open-data feed
Maplegrange Construction Ltd fit out of Childcare Facility at Blackwood Square, Northwood Avenue, Santry Dublin 9.
224 m²Builder not named
16 Dec 2021
SN0005716FL BCMS open-data feed
Commencement at Northwood Avenue, Santry, Dublin 9. consisting of 330 number apartments, associated shared services consisting of multi-function area, gym and concierge area, childcare facility and five number ground floor mixed use commercial units (shell only), basement ancillary/parking and associated works.
330 units · 30,811 m²Builder not named
24 Nov 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Nov 2021 · Latest notice
4 notices · phased
Rush, Dublin · Fingal County Council · Planning ref SHD/003/19
Block B consists of 21 apartments ranging from ground to second floor. The apartments on the upper floors are served by a single stair. The height of the building is less than 11m.
Notice identity Works stated Scale Commenced
CN0083632FL BCMS open-data feed
Block A consists of 27 apartments ranging from ground to second floor. The apartments on the upper floors are served by a single stair. The height of the building is less than 11m.
27 units · 2,257 m²Builder not named
16 Nov 2021
CN0083634FL BCMS owner-supplied export
Block B consists of 21 apartments ranging from ground to second floor. The apartments on the upper floors are served by a single stair. The height of the building is less than 11m.
21 units · 1,761 m²Builder named
16 Nov 2021
CN0075873FL BCMS open-data feed
Construction of 82 houses at Skerries Rd, Co. Dublin. House no. 34, 36-50 inclusive Mariners Ave, 52-74 (even no. only) inclusive Mariners Ave, 1-10 inclusive Mariners Green, 1-15 & 17-42 inclusive Mariners Drive and 6, 8 & 10 Palmers Ave.
82 units · 9,103 m²Builder not named
10 May 2021
CN0062181FL BCMS open-data feed
Construction of 34 No. dwelling houses at Skerries road, Rush, Co. Dublin. House numbers 1-33 inclusive and number 35 Mariners Avenue.
34 units · 3,709.5 m²Builder not named
27 Feb 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
15 Nov 2021 · Latest notice
2 notices · phased
Maynooth, Kildare · Kildare County Council · Planning ref 18/761
House Nos 1-37 incl. and 39, 41, 43, 45, 47, 49, 51, 53, 55 and 57 THE WALK Mullen Park, Maynooth Co. Kildare.
Notice-stated scale
47 units · 5,573.1 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0083329KE BCMS open-data feed
House Nos 1-37 incl. and 39, 41, 43, 45, 47, 49, 51, 53, 55 and 57 THE WALK Mullen Park, Maynooth Co. Kildare.
47 units · 5,573.1 m²Builder not named
15 Nov 2021
CN0050783KE BCMS open-data feed
Construction of 37 dwelling houses and associated site development works at Mullen Park [The Green, The Drive, The Avenue] Maynooth, Co. Kildare.
37 units · 4,868.7 m²Builder not named
24 Apr 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 Nov 2021 · Latest notice
2 notices · phased
Foxrock, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP 304068-19
It is proposed to construct a residential building at Stillorgan Road, Foxrock, Dublin 18. The proposed development will consist of two blocks over shared basement, each of which will be served by two escape stairs.
Notice identity Works stated Scale Commenced
CN0083168DR BCMS owner-supplied export
Fit-out of 2 No amenity areas at Roselawn. Works include installation of partitions & internal joinery, wall, ceiling and floor finishes, mechanical & electrical (excluding Life Safety systems – FA&EL), sanitary ware & furniture.
332 m²Builder named
09 Nov 2021
SN0004964DR BCMS open-data feed
It is proposed to construct a residential building at Stillorgan Road, Foxrock, Dublin 18. The proposed development will consist of two blocks over shared basement, each of which will be served by two escape stairs.
142 units · 14,513 m²Builder not named
18 Dec 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Oct 2021 · Latest notice
2 notices · phased
Dublin 15, Dublin · Dublin City Council · Planning ref 2596/20
Residential Development at Rathborne, consisting of 92 No. housing units and all associated site works
Notice identity Works stated Scale Commenced
CN0082268DC BCMS open-data feed
Residential Development at Rathborne, consisting of 92 No. housing units and all associated site works
92 units · 12,060.1 m²Builder not named
13 Oct 2021
CN0079402DC BCMS owner-supplied export
Enabling works only to the proposed Rathborne Site for development consisting of reducing levels and excavation of existing material. The main works will be subject to a separate long form commencement notice.
Scale not statedBuilder named
29 Jul 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 Oct 2021 · Latest notice
4 notices · phased
Tullamore, Offaly · Offaly County Council · Planning ref 17/231
Construction of Phase 4 of a eight phase development consisting of a total of 50 number houses two storey dwellings for this phase (8 No. Type T, four bedroom, two-storey detached house, 6 No. Type T1, four bedroom, two-storey detached house, 18 No. Type S1, four bedroom, two-storey semi-detached house, 6 No. Type R1, three bedroom, two-storey semi-detached house, 2 No. Type U1, three bedroom, two-storey semi-detached house, 2 No. Type U2, three bedroom, two-storey semi-detached house, 2 No. Type U3, three bedroom, two-storey semi-detached house, 2 No. Type U4, three bedroom, two-storey semi-detached house, 1 No. Type B1, three bedroom, two-storey terrace house, 1 No. Type B2, three bedroom, two-storey terrace house, 1 No. Type B3, three bedroom, two-storey terrace house, 1 No. Type B4, three bedroom, two-storey terrace house). Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
Notice-stated scale
50 units · 44,499.2 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0082216OY BCMS open-data feed
Construction of Phase 4 of a eight phase development consisting of a total of 50 number houses two storey dwellings for this phase (8 No. Type T, four bedroom, two-storey detached house, 6 No. Type T1, four bedroom, two-storey detached house, 18 No. Type S1, four bedroom, two-storey semi-detached house, 6 No. Type R1, three bedroom, two-storey semi-detached house, 2 No. Type U1, three bedroom, two-storey semi-detached house, 2 No. Type U2, three bedroom, two-storey semi-detached house, 2 No. Type U3, three bedroom, two-storey semi-detached house, 2 No. Type U4, three bedroom, two-storey semi-detached house, 1 No. Type B1, three bedroom, two-storey terrace house, 1 No. Type B2, three bedroom, two-storey terrace house, 1 No. Type B3, three bedroom, two-storey terrace house, 1 No. Type B4, three bedroom, two-storey terrace house). Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
50 units · 44,499.2 m²Builder not named
06 Oct 2021
CN0071567OY BCMS open-data feed
Construction of Phase 3A of a five phase development consisting of a total of 8 number houses two storey dwellings for this phase (4 No. Type C1, three bedroom, two-storey semi-detached houses, 2 No. Type G1a, three bedroom, two-storey semi-detached houses & 2 No. Type G1b, three bedroom, two-storey semi-detached houses). Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
8 units · 8,160 m²Builder not named
12 Dec 2020
CN0062446OY BCMS open-data feed
Construction of Phase 2A of a four phase development consisting of a total of 10 number houses two storey dwellings for this phase (8 No. Type C1, three bedroom, two-storey semi-detached houses, 2 No. Type C4, three bedroom, two-storey semi-detached houses). Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
10 units · 1,220 m²Builder not named
28 Feb 2020
CN0047394OY BCMS open-data feed
Construction of Phase 1 of a four phase development consisting of a total of 24 number houses two storey dwellings for this phase (4 No. Type C1, three bedroom, two-storey semi-detached houses, 1 No. Type C3, three bedroom, two-storey semi-detached house, 1 No. Type C4, three bedroom, two-storey semi-detached houses, 2 No. Type D1, four bedroom, two-storey semi-detached houses, 1 No. Type D2, four bedroom, two-storey semi-detached houses, 4 No. Type E, four bedroom, two-storey detached houses, 1 No. Type F1, four bedroom, two-storey detached house, 1 No. Type F2, four bedroom, two-storey detached house). 1 No. electricity substation, associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Ardan, Tullamore, County Offaly.
24 units · 3,907.2 m²Builder not named
04 Jan 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Sep 2021 · Latest notice
4 notices · phased
Portmarnock, Dublin · Fingal County Council · Planning ref F14A/0132/E1
Construction of 34 No. houses at Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin - No's 148-152, 154-157, 160, 161, 164-167, 171, 172, 175, 176, 180-189, 193, 194, 198, 199 & 203.
Notice-stated scale
34 units · 84,498.5 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0081770FL BCMS open-data feed
Construction of 34 No. houses at Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin - No's 148-152, 154-157, 160, 161, 164-167, 171, 172, 175, 176, 180-189, 193, 194, 198, 199 & 203.
34 units · 84,498.5 m²Builder not named
27 Sep 2021
CN0079098FL BCMS open-data feed
Construction of 13 Houses - No's 127-138 and No. 147 Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin
13 units · 5,146.5 m²Builder not named
26 Jul 2021
CN0077787FL BCMS owner-supplied export
Construction of 21 Houses - No's 114-126 and No's 139-146 Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin
21 units · 23,346 m²Builder not named
21 Jun 2021
CN0073698FL BCMS owner-supplied export
Construction of 16 houses - No's 78-84, No's 87-89, No's 104-106, No's 109-110 and No. 113 Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin
16 units · 18,293.5 m²Builder not named
06 Apr 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Sep 2021 · Latest notice
4 notices · phased
Trim, Meath · Meath County Council · Planning ref TA/160093,TA200249
Construction of 74 housing units consisting of No's 22 and 26-39 Effernock Crescent, No's 1-7 Effernock Close, No's 37-39 & 42-54 Effernock Green, No's 68-70 Effernock Avenue and No's 1-12 ,14-31 and 33-35 Effernock Glebe and all other associated ancillary site works.
Notice identity Works stated Scale Commenced
CN0081721MH BCMS open-data feed
Construction of 74 housing units consisting of No's 22 and 26-39 Effernock Crescent, No's 1-7 Effernock Close, No's 37-39 & 42-54 Effernock Green, No's 68-70 Effernock Avenue and No's 1-12 ,14-31 and 33-35 Effernock Glebe and all other associated ancillary site works.
74 units · 8,963.6 m²Builder not named
24 Sep 2021
CN0075944MH BCMS open-data feed
Construction of 109 residential dwellings, consisting of units 1-12 & 14-50 Effernock Lane, and units 18-24, 26-44, 94-112 & 114-128 Effernock Avenue and all associated ancillary site works.
109 units · 13,242.6 m²Builder not named
14 May 2021
CN0074692MH BCMS open-data feed
Construction of 29 residential housing units and all associated ancillary site works.
29 units · 3,787.4 m²Builder not named
23 Apr 2021
CN0070189MH BCMS owner-supplied export
Construction of 21 Effernock Crescent and 55-57 Effernock Green and all associated ancillary site work.
4 units · 423 m²Builder named
02 Nov 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Sep 2021 · Latest notice
2 notices · phased
Dungarvan, Waterford · Waterford City and County Council · Planning ref 17/310
Phase 2 Housing Development Shandon Road, Dungarvan.
Notice-stated scale
36 units · 141,840 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0081031WD BCMS open-data feed
Phase 2 Housing Development Shandon Road, Dungarvan.
26 units · 70,980 m²Builder not named
13 Sep 2021
CN0037630WD BCMS open-data feed
Phase 1 Housing Development Shandon Road, Dungarvan.
36 units · 141,840 m²Builder not named
16 Apr 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.