New build
22 Dec 2022 · Latest notice
3 notices · phased
Prosperous, Kildare · Kildare County Council · Planning ref 20/1080
Construction of 18 No. dwellings and all ancillary siteworks which is Phase 1 of the overall proposed development of 49 No. dwellings at Downings North, Prosperous, Co. Kildare
Notice identity Works stated Scale Commenced
CN0096510KE BCMS open-data feed
Construction of 13 no. dwellings and all ancillary site works as part of overall development of 49 no. dwellings at Downings North, Prosperous, Kildare
13 units · 1,560 m²Builder not named
22 Dec 2022
CN0088589KE BCMS open-data feed
Construction of 18 No. dwellings and all ancillary siteworks of the overall proposed development of 49 No. dwellings at Downings North, Prosperous, Co. Kildare
18 units · 2,502 m²Builder not named
27 Apr 2022
CN0073527KE BCMS owner-supplied export
Construction of 18 No. dwellings and all ancillary siteworks which is Phase 1 of the overall proposed development of 49 No. dwellings at Downings North, Prosperous, Co. Kildare
49 units · 2,664 m²Builder named
08 Apr 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Dec 2022 · Commenced
1 notice · 1 source identity
Kilkenny, Kilkenny · Kilkenny County Council · Planning ref ABP-305062-19
Construction of 87 housing units in a mix of terraced housing units, duplexes and apartments along with one five- bedroomed group home and one community facility and all associated site works and service connections.
New build
16 Dec 2022 · Commenced
1 notice · 1 source identity
Enniscorthy, Wexford · Wexford County Council · Planning ref 20180945, 20190160, 20201597
Phase 3 - Construction of 41 no. dwelling houses & associated site works at Greenhill, Clonhasten, Enniscorthy
New build
09 Dec 2022 · Latest notice
12 notices · phased
Naas, Kildare · Kildare County Council · Planning ref ABP-311825-21
Block 7 ground floor internal layout change for 1no. additional unit to previous approved Ref 8460049 bringing total to 20no. units at Devoy Quarter, Naas West, Co. Kildare
Notice identity Works stated Scale Commenced
SN0007968KE BCMS open-data feed
Phase 21: Construction of Bin Store D at Devoy Quarter, Naas West, Naas, Co. Kildare
20.1 m²Builder not named
09 Dec 2022
SN0007867KE BCMS open-data feed
Phase 20: Construction of bin store E at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m²Builder not named
14 Nov 2022
SN0007868KE BCMS open-data feed
Phase 22: Construction of bin store C at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m²Builder not named
14 Nov 2022
SN0007869KE BCMS open-data feed
Phase 23: Construction of bin store B at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m²Builder not named
14 Nov 2022
SN0007870KE BCMS open-data feed
Phase 24: Construction of bin store A at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m²Builder not named
14 Nov 2022
SN0007896KE BCMS open-data feed
Phase 19: Construction of bin store F & G at Devoy Quarter, Naas West, Naas, Co. Kildare
37 m²Builder not named
28 Oct 2022
SN0007768KE BCMS open-data feed
Phase 16: Block 8: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
2 units · 1,078.6 m²Builder not named
18 Oct 2022
SN0007769KE BCMS open-data feed
Phase 17: Block 9: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
2 units · 1,077.9 m²Builder not named
18 Oct 2022
SN0007770KE BCMS open-data feed
Phase 18: Block 3: Construction of 8no additional units bringing total to 30no. units at Devoy Quarter Naas West Co. Kildare
8 units · 2,058.9 m²Builder not named
18 Oct 2022
SN0007648KE BCMS open-data feed
Block 4 Construction of 4no. additional units bringing total to 24no. units at Devoy Quarter, Naas West, Co. Kildare
4 units · 629 m²Builder not named
19 Sep 2022
SN0007568KE BCMS open-data feed
Construction of mixed use building with a crèche at ground floor and 2no. apartments above creche at Devoy Quarter, Naas West, Naas, County Kildare
2 units · 348.8 m²Builder not named
18 Aug 2022
CN0091855KE BCMS owner-supplied export
Block 7 ground floor internal layout change for 1no. additional unit to previous approved Ref 8460049 bringing total to 20no. units at Devoy Quarter, Naas West, Co. Kildare
171 units · 1,922.6 m²Builder named
27 Jul 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Dec 2022 · Commenced
1 notice · 1 source identity
Cork, Cork · Cork City Council · Planning ref ABP-301991-18
Description of proposed development to Construction of 69no. residential units No's 1-69 The Crawford Centre Jacob's Island Mahon Cork together with commercial units and all associated site development works. No. of apart ments/maisonettes in this building to 69 Total No. of Dwelling Units (all phases) to 69 Total No. of Multiple Unit Dwellings (all phases) to 69 and No. of Dwelling Units for this Phase to 69
New build
30 Nov 2022 · Latest notice
8 notices · phased
Celbridge, Kildare · Kildare County Council · Planning ref ABP-306504-20
Nos.1-4 Ardrath Place and Nos.15-30 Ardrath Way at Ardrath, Crodaun, Celbridge, Co. Kildare
Notice-stated scale
107 units · 424,113.6 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0007928KE BCMS open-data feed
Fit out of creche unit (creche shell unit under previous CN0086317KE) in Block B at Ardrath, Crodaun, Celbridge, Co. Kildare
191 m²Builder not named
30 Nov 2022
CN0086317KE BCMS open-data feed
2 Storey Apartment Block B with Créche unit at Ardrath, Crodaun, Celbridge, Co. Kildare
16 units · 1,578 m²Builder not named
25 Feb 2022
CN0084545KE BCMS open-data feed
House Nos. 1-14 Ardrath Way, 1-26 Ardrath Gardens, 9-30, 46-84 Ardrath Meadow, Crodaun, Celbridge, Co. Kildare
107 units · 398,662.5 m²Builder not named
21 Dec 2021
CN0083969KE BCMS owner-supplied export
2-storey apartment block B with crèche unit, Ardrath, Crodaun, Celbridge, Co. Kildare
16 units · 1,578 m²Builder not named
03 Dec 2021
CN0083122KE BCMS open-data feed
4-storey Apartment Block A, Ardrath, Crodaun, Celbridge, Co. Kildare
86 units · 7,276 m²Builder not named
04 Nov 2021
CN0081502KE BCMS open-data feed
House Nos.27-52 Ardrath Gardens, Nos.39-58 Ardrath Crescent, Nos. 1-8, 31-45, 85-96 Ardrath Meadow, Crodaun, Celbridge, co. Kildare
81 units · 424,113.6 m²Builder not named
27 Sep 2021
CN0077677KE BCMS owner-supplied export
Nos. 1-38 Ardrath Crescent and Nos. 5-8 Ardrath Place at Ardrath, Crodaun, Celbridge, Co. Kildare
42 units · 216,329.4 m²Builder not named
21 Jun 2021
CN0072787KE BCMS owner-supplied export
Nos.1-4 Ardrath Place and Nos.15-30 Ardrath Way at Ardrath, Crodaun, Celbridge, Co. Kildare
20 units · 18,246.6 m²Builder not named
05 Mar 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Nov 2022 · Latest notice
3 notices · phased
Kinsale, Cork · Cork County Council · Planning ref 20/06563
Construction of 28 No. dwellinghouses, at 1-14 Campion Mews & 14-27 Campion Avenue, Rathbeg, Kinsale, Co. Cork, and associated site works.
Notice identity Works stated Scale Commenced
CN0095975CC BCMS open-data feed
Construction of 35 No. dwelling houses at 1-8 Cherry Mews, 32-47 Orchid Grove & 1-11 Bilberry Row, Rathbeg, Kinsale, Co. Cork, and associated site works.
35 units · 3,812.5 m²Builder not named
30 Nov 2022
CN0088468CC BCMS open-data feed
Construction of 19 No. dwellinghouses, at 7 - 13 & 28 - 39 Campion Avenue, Rathbeg, Kinsale, Co. Cork, and associated site works.
19 units · 2,375.8 m²Builder not named
22 Apr 2022
CN0087009CC BCMS owner-supplied export
Construction of 28 No. dwellinghouses, at 1-14 Campion Mews & 14-27 Campion Avenue, Rathbeg, Kinsale, Co. Cork, and associated site works.
28 units · 3,173.2 m²Builder named
11 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 Nov 2022 · Latest notice
5 notices · phased
Midleton, Cork · Cork County Council · Planning ref 18/05691
Construction of Phase 5 (43no. dwelling units) & associated site works. This certificate covers units 11-18 inclusive & 22-56 inclusive
Notice identity Works stated Scale Commenced
CN0095655CC BCMS open-data feed
Construction of Phase 5 (43no. dwelling units) & associated site works. This certificate covers units 11-18 inclusive & 22-56 inclusive
43 units · 5,851.6 m²Builder not named
22 Nov 2022
CN0077999CC BCMS owner-supplied export
Construction of Creche and apartments @ Charleston Woods, construction of a 2 storey building consisting of a creche on the ground floor with 2no. apartments on the first floor & associated site works.
2 units · 265 m²Builder named
05 Jul 2021
CN0069222CC BCMS open-data feed
Construction of Phase 3 (13 No. dwelling Units) & associated site works This certificate covers units 1-10 inclusive & 19-21 inclusive
13 units · 1,679.4 m²Builder not named
16 Oct 2020
CN0067103CC BCMS open-data feed
Construction of Phase 2 (17No. dwelling Units) & associated site works This certificate covers units 57-73 inclusive.
17 units · 1,915.8 m²Builder not named
13 Aug 2020
CN0063838CC BCMS owner-supplied export
Construction of Phase 1 (13No. dwelling Units) & associated site works This certificate covers House 76-88 inclusive.
13 units · 1,718 m²Builder named
20 Apr 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
18 Nov 2022 · Latest notice
6 notices · phased
Drogheda, Louth · Louth County Council · Planning ref 19/531 ABP 305819/19
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks.
Notice identity Works stated Scale Commenced
CN0095683LH BCMS open-data feed
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks
23 units · 2,947 m²Builder not named
18 Nov 2022
CN0093528LH BCMS open-data feed
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks.
52 units · 9,956 m²Builder not named
09 Sep 2022
CN0077595LH BCMS open-data feed
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments and associated siteworks
41 units · 4,949.3 m²Builder not named
18 Jun 2021
CN0077597LH BCMS open-data feed
217no.Residential units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks
9 units · 1,105.5 m²Builder not named
18 May 2021
CN0075288LH BCMS owner-supplied export
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks.
217 units · 757.5 m²Builder named
03 May 2021
CN0075277LH BCMS open-data feed
217no. Residential Units to consist of 137no. dwellings and 80no. duplex apartments, creche and associated siteworks
6 units · 708 m²Builder not named
23 Apr 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Nov 2022 · Latest notice
5 notices · phased
STILLORGAN, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP30534519
The development consists of Blocks H, J, M and Q over a single storey basement car park. The development is designed on a sloping site in which Blocks H, J and Q have access direct to the outside from the basement level. There are also a number of basement level apartments beneath Block H and J. Block H is a 10 storey block with 99 apartment units. Block J is a 9 storey block with 75 apartment units. Block M is a 9 storey block with 73 apartment units. Blocks H, J & M have a top storey height above 18m. Block Q is a substation that can be accessed from the basement level.
Notice identity Works stated Scale Commenced
SN0007875DR BCMS open-data feed
The construction of a new multi-storey creche building as a shell & core development.
634.8 m²Builder not named
17 Nov 2022
SN0005602DR BCMS open-data feed
It is proposed to construct a new six storey residential development at the Grange, Brewery Road, Stillorgan. The development consists of residential Block N. The block is a seven storey building with 40 apartment units. The top occupied storey is above 18m in height. The block is accessed from ground level. As the proposed works involve the design and construction of a new building, a Fire Safety Certificate is required.
40 units · 3,336 m²Builder not named
12 Oct 2020
SN0005572DR BCMS open-data feed
The development consists of Blocks H, J, M and Q over a single storey basement car park. The development is designed on a sloping site in which Blocks H, J and Q have access direct to the outside from the basement level. There are also a number of basement level apartments beneath Block H and J. Block H is a 10 storey block with 99 apartment units. Block J is a 9 storey block with 75 apartment units. Block M is a 9 storey block with 73 apartment units. Blocks H, J & M have a top storey height above 18m. Block Q is a substation that can be accessed from the basement level.
247 units · 29,816 m²Builder not named
25 Sep 2020
CN0067016DR BCMS owner-supplied export
Enabling works only to the proposed Grange Site for redevelopment consisting of reducing levels and bulk excavation of existing material. The main works will be subject to a separate long form commencement notice.
Scale not statedBuilder named
10 Aug 2020
CN0060944DR BCMS owner-supplied export
Demolition works only to existing buildings on the proposed site for future redevelopment. The works include demolition of the Grange Select Marketing Suite (single Storey), the existing Oaktree Business Centre (2 Storey) and the Lodge building (2 storey) totaling approx 1,398m2 GFA.
1,398 m²Builder not named
23 Jan 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 Nov 2022 · Latest notice
8 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SHD3ABP-300555-18
Phase 2C: Construction of 82 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
Notice identity Works stated Scale Commenced
SN0007856SD BCMS open-data feed
The proposed development consists of a three storey building is a mix of apartments and duplex units (Apartment Block D). - Parklands, Dublin 24
18 units · 1,939 m²Builder not named
08 Nov 2022
CN0091253SD BCMS open-data feed
Phase 2C: Construction of 82 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
82 units · 10,919.0 m²Builder not named
06 Jul 2022
CN0090731SD BCMS open-data feed
Construction of 2no. residential units in Phase 1A, Block A, Parklands, part of the housing development at Fortunestown Lane and Garter Lane, Saggart, Co. Dublin.
2 units · 191.8 m²Builder not named
27 Jun 2022
CN0084418SD BCMS open-data feed
Phase 2B: Construction of 101 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
101 units · 12,464.8 m²Builder not named
07 Dec 2021
CN0077467SD BCMS open-data feed
Phase 2A: Construction of 49 houses at Fortunestown Lane & Garter Lane Residential Development, Saggart, Co. Dublin.
49 units · 7,215.9 m²Builder not named
09 Jun 2021
CN0066683SD BCMS owner-supplied export
Construction of 6no. residential units within Phase 1A, Blocks A and B, Parklands, Dublin 24. Specifically numbered 1-4 Parklands Place and 2 and 4 Parklands Boulevard.
65 units · 288 m²Builder named
28 Jul 2020
CN0062596SD BCMS open-data feed
Phase 1B 91 houses at Fortunestown Lane and Garter Lane residential development, Saggart, Co. Dublin
91 units · 11,957.7 m²Builder not named
09 Mar 2020
CN0047277SD BCMS open-data feed
Phase 1A for 95 houses at Fortunestown Lane and Garter Lane residential development with associated siteworks in Saggart, Co. Dublin.
95 units · 10,165 m²Builder not named
02 Jan 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Nov 2022 · Latest notice
7 notices · phased
Limerick, Limerick · Limerick City and County Council · Planning ref 18434
Construction of 14 no. residential units at Bloodmill Road, Singland, Co.Limerick and all associated site works.
Notice identity Works stated Scale Commenced
SN0007828LL BCMS open-data feed
Construction of Storage Building ancillary to apartment buildings and associated site works.
54 m²Builder not named
07 Nov 2022
CN0076608LL BCMS owner-supplied export
Construction of 14 no. residential units at Bloodmill Road, Singland, Co.Limerick and all associated site works.
29 units · 1,554 m²Builder named
03 Jun 2021
CN0076555LL BCMS owner-supplied export
Construction of two Apartment blocks (Block 2 & 3) and all associated site works. The four- storey Block 2 containing 16 apartments and the four-storey Block 3 containing 8 apartments
29 units · 2,252 m²Builder named
25 May 2021
CN0073682LL BCMS owner-supplied export
Construction of 9 no. residential units at Bloodmill Road, Singland, Co. Limerick; to include 2 no. detached 3 bed houses, and 7 no. 3 bed terraced houses and all associated site works.
29 units · 929.9 m²Builder named
12 Apr 2021
CN0069559LL BCMS owner-supplied export
Phase 2 consists of Construction of 20 no. residential units at Bloodmill Road, Singland, Co. Limerick; to include 2 no. detached 3 bed houses, 18 no. semi-detached 3 bed houses and 7 no. 3 bed terraced houses and all associated site works.
29 units · 2,957 m²Builder not named
21 Oct 2020
SN0005544LL BCMS open-data feed
Construction of Apartment Block
5 units · 517 m²Builder not named
14 Sep 2020
CN0065265LL BCMS owner-supplied export
Phase 1A consists of Construction of 20 no. residential units at Bloodmill Road, Singland, Co. Limerick; to include 1 no. detached 4 bed house, 12 no. semi-detached 3 bed houses; 7 no. 3 bed terraced houses and all associated site works including site entrance; foul water pumping station; on site attenuation tanks; and landscaping.
29 units · 2,214.8 m²Builder not named
22 Jun 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Nov 2022 · Latest notice
3 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SD188/0006
Construction of 22 housing units at Mayfield Park, Clondalkin, Dublin 22.
Notice identity Works stated Scale Commenced
CN0095150SD BCMS open-data feed
Construction of 18no. Units (over Blocks 1,2,3 & 4) at Mayfield Park, Clondalkin, Dublin 22.
18 units · 6,925.0 m²Builder not named
04 Nov 2022
CN0086207SD BCMS open-data feed
Construction of 3no. Apartment units (59,60,61) at Mayfield Park, Clondalkin, Dublin 22.
3 units · 286.4 m²Builder not named
18 Feb 2022
CN0071238SD BCMS owner-supplied export
Construction of 22 housing units at Mayfield Park, Clondalkin, Dublin 22.
24 units · 17,235.2 m²Builder named
30 Nov 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
Change of use
14 Oct 2022 · Latest notice
4 notices · phased
Waterford, Waterford · Waterford City and County Council · Planning ref 20/871
development consisting of change of use of the existing building from religious (a convent & ancillary buildings) to residential use for the delivery of 50 no residential units & community facilities
Notice identity Works stated Scale Commenced
SN0007752WD BCMS open-data feed
Change of use to form 2no. Apartments Courtyard Building 1
2 units · 137.1 m²Builder not named
14 Oct 2022
SN0007753WD BCMS open-data feed
Change of use to form 4 no Apartments Courtyard Building 3
4 units · 152.3 m²Builder not named
14 Oct 2022
CN0091865WD BCMS owner-supplied export
14no. Residential Dwellings which includes 7no. one beds, 6no. two beds and 1no. three bed
14 units · 1,018.0 m²Builder named
25 Jul 2022
CN0091557WD BCMS owner-supplied export
development consisting of change of use of the existing building from religious (a convent & ancillary buildings) to residential use for the delivery of 50 no residential units & community facilities
50 units · 4,295 m²Builder named
18 Jul 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Oct 2022 · Latest notice
4 notices · phased
Rathdrum, Wicklow · Wicklow County Council · Planning ref 19/991
Residential Units 33-52 (Phase 4 & Part Phase 5) Avonmore View, Ballygannon, Rathdrum, Co. Wicklow
Notice identity Works stated Scale Commenced
CN0094799WW BCMS open-data feed
Residential Units 21-32 & 53-56 (Phase 6) Avonmore View, Ballygannon, Rathdrum, Co. Wicklow
16 units · 1,753.2 m²Builder not named
13 Oct 2022
CN0090079WW BCMS owner-supplied export
Residential Units 33-52 (Phase 4 & Part Phase 5) Avonmore View, Ballygannon, Rathdrum, Co. Wicklow
20 units · 2,500.8 m²Builder named
24 May 2022
CN0082621WW BCMS open-data feed
Residential Units 1-20 (Phase 2) Avonmore View, Ballygannon, Rathdrum, Co.Wicklow
20 units · 1,932.2 m²Builder not named
19 Oct 2021
CN0077918WW BCMS open-data feed
[Avonmore View-Phase's 1 & 3: Dwelling Units 57-74] Avonmore View, Ballygannon, Rathdrum, Co. Wicklow
18 units · 1,831.6 m²Builder not named
24 Jun 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Oct 2022 · Latest notice
3 notices · phased
Belmayne, Dublin · Dublin City Council · Planning ref ABP-312264-21
Phase 2: Construction of 85 of 258 No. Apartment PRS P4 Residential Development including undercroft car park, amenity spaces & ESB Sub- stations at O'Neill Court, Main Street, Belmayne, Dublin 13. These apartments/duplexe s will be constructed within Blocks 3 & 4.
Notice identity Works stated Scale Commenced
CN0094210DC BCMS open-data feed
Phase 1: Construction of 173 of 258 No. Apartment PRS P4 Residential Development including undercroft car park, amenity spaces & ESB Sub-stations at O'Neill Court, Main Street, Belmayne, Dublin 13. These apartments/duplexes will be constructed within Blocks 1, 2, 5 & 6.
173 units · 28,657 m²Builder not named
03 Oct 2022
CN0094212DC BCMS owner-supplied export
Phase 2: Construction of 85 of 258 No. Apartment PRS P4 Residential Development including undercroft car park, amenity spaces & ESB Sub- stations at O'Neill Court, Main Street, Belmayne, Dublin 13. These apartments/duplexe s will be constructed within Blocks 3 & 4.
258 units · 28,657 m²Builder not named
03 Oct 2022
CN0086712DC BCMS owner-supplied export
Enabling works in connection with 258 No. Apartment PRS P4, Belmayne, Dublin 13, limited to the removal of existing soil heap, site strip & vegetation, diversion of services within the site, erection of site hoarding and any other statutory liaison required regarding the works.
258 unitsBuilder named
01 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Sep 2022 · Latest notice
3 notices · phased
Oldtown, Swords, Dublin · Fingal County Council · Planning ref F17A/0666
The development consists of the construction of Blocks A & B, comprising of 39 No. Apartments at 1 and 2 Meadowbank Road, Oldtown, Swords, Co. Dublin.
Notice identity Works stated Scale Commenced
CN0093869FL BCMS open-data feed
The development consists of the construction of Block C, comprising of 15 No. Apartments at 30 Meadowbank Grove, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder not named
20 Sep 2022
CN0093871FL BCMS owner-supplied export
The development consists of the construction of Blocks A & B, comprising of 39 No. Apartments at 1 and 2 Meadowbank Road, Oldtown, Swords, Co. Dublin.
39 units · 3,626 m²Builder named
20 Sep 2022
CN0041950FL BCMS open-data feed
The construction of 41 houses on lands at Miller's Glen, Oldtown, Swords Co. Dublin: 1 - 25 (odd) Miller's Avenue, 1 - 11 (odd) and 12 - 16 (even) Meadowbank Green, 69 Longview Avenue, and 4 - 28 (even) Meadowbank Grove, Miller's Glen.
41 units · 45,276 m²Builder not named
30 Jul 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Sep 2022 · Latest notice
15 notices · phased
Maynooth, Kildare · Kildare County Council · Planning ref 18301230
Units Units 1-41 Meadow View (41 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
Notice identity Works stated Scale Commenced
CN0093735KE BCMS owner-supplied export
Units Units 1-41 Meadow View (41 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
142 units · 4,701.2 m²Builder named
19 Sep 2022
CN0069582KE BCMS owner-supplied export
REFURBISHMENT AND EXTENSION OF GATE LODGE AT MARIAVILLA HOUSE, MOYGLARE ROAD, MAYNOOTH, KILDARE
1 unit · 103.6 m²Builder named
23 Oct 2020
SN0004505KE BCMS open-data feed
Units 01-22 Mariavilla Woods, (Apt Block 1 - 22 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 1,984.2 m²Builder not named
12 Aug 2019
SN0004508KE BCMS open-data feed
Units 23-46 Mariavilla Woods, (Apt Block 2 - 24 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 2,036.2 m²Builder not named
12 Aug 2019
CN0054569KE BCMS open-data feed
Units Units 1-14 Lyreen Drive, Units 1-7 Lyreen Mews, Units 1-21 Moyglare Green, Units 1-25 Moyglare Grove, Units 1-21 Moyglare Ridge, Units 1-21 Moyglare Rise, Units 1-16 Moyglare Heath, (125 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
125 units · 15,193.3 m²Builder not named
26 Jul 2019
CN0051952KE BCMS open-data feed
Units 9-11 Mariavilla Grange, Units 1-12 Mariavilla Way, Units 1-10 Mariavilla Square, Units 1-13 Mariavilla Chase, Units 47-56 Mariavilla Woods, Units 1-3 Lyreen Avenue, (51 Units in Total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
51 units · 6,022.9 m²Builder not named
23 May 2019
SN0004196KE BCMS open-data feed
Units 37-44 Mariavilla Way, (Duplex Block 3 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
17 May 2019
SN0004197KE BCMS open-data feed
Units 29-36 Mariavilla Way, (Duplex Block 4 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
16 May 2019
SN0004198KE BCMS open-data feed
Units 21-28 Mariavilla Way, (Duplex Block 5 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
16 May 2019
SN0004200KE BCMS open-data feed
Units 13-20 Mariavilla Way, (Duplex Block 6 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
16 May 2019
SN0004201KE BCMS open-data feed
Units 01-08 Mariavilla Grange, (Duplex Block 7 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
16 May 2019
SN0004105KE BCMS open-data feed
Units 45-52 Mariavilla Way, (Duplex Block 2 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
11 Apr 2019
SN0004102KE BCMS open-data feed
Units 53-60 Mariavilla Way, (Duplex Block 1 - 8 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
150 units · 875 m²Builder not named
10 Apr 2019
CN0048340KE BCMS open-data feed
Units 15-34 Lyreen Drive, Units 1-19 Lyreen Lawn, Units 1-15 Lyreen Glen, Units 9-21 Lyreen Close, (67 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
67 units · 9,531.9 m²Builder not named
18 Feb 2019
CN0047877KE BCMS open-data feed
Unit 4-6 Lyreen Avenue, Units 1-24 Lyreen Place, Units 1-8 Lyreen Close, (35 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
35 units · 4,730.1 m²Builder not named
04 Feb 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
Material alteration Change of use
29 Aug 2022 · Commenced
1 notice · 1 source identity
Limerick, Limerick · Limerick City and County Council · Planning ref 15645 & 217025
the change of use of an existing aparthotel building from commercial use to residential use to provide 56 no. apartments, the removal of a single storey glazed link between the aparthotel building and Ardhu House and associated site, car park and boundary works.
New build
26 Aug 2022 · Latest notice
5 notices · phased
Navan, Meath · Meath County Council · Planning ref ABP-311199-21
Construction of 40no. 2 Storey and 8no. 3 Storey Residential Dwellings.
Notice-stated scale
48 units · 77,376 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0007597MH BCMS open-data feed
Block C - The development consists of the construction of a terrace duplexes with 10no 3-bedroom duplexes with own door access at ground level and 10no. 2 storey duplexes with 2no bedrooms accessed via private stairs entered at ground floor level.
20 units · 2,321 m²Builder not named
26 Aug 2022
SN0007598MH BCMS open-data feed
Block D - The development consists of the construction of a terrace duplexes with 4no 3-bedroom duplexes with own door access at ground level and 4no. 2 storey duplexes with 2no bedrooms accessed via private stairs entered at ground floor level.
8 units · 993.1 m²Builder not named
26 Aug 2022
SN0007398MH BCMS open-data feed
Maisonette Unit - Block B - The construction of 2 storey maisonette building with 2no. 1-bedroom units with own door access at ground level and 2no. 2 bedroom unit accessed from floor below.
4 units · 309.1 m²Builder not named
08 Jul 2022
SN0007300MH BCMS open-data feed
Maisonette Unit - Block A - The Construction of 2 storey Maisonette Building with 2no. 1-bedroom units with own door access at ground level and 2no. 2-bedroom unit accessed from floor below.
4 units · 309.1 m²Builder not named
08 Jun 2022
CN0087357MH BCMS open-data feed
Construction of 40no. 2 Storey and 8no. 3 Storey Residential Dwellings.
48 units · 77,376 m²Builder not named
23 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Aug 2022 · Latest notice
2 notices · phased
Kinsale, Cork · Cork County Council · Planning ref 21/06368
This proposed development involves the demolition of 3 no. existing vacant dwellings on site, and the construction of 25 no. housing units. This commencement notice is for phase 1,being 8 houses, house numbers 1-8.
Notice identity Works stated Scale Commenced
CN0092926CC BCMS open-data feed
This proposed development involves the demolition of 3 no. existing vacant dwellings on site, and the construction of 25 no. housing units. This commencement notice is for phase 2, being 17 houses, house numbers 9-25.
17 units · 1,216 m²Builder not named
24 Aug 2022
CN0089117CC BCMS owner-supplied export
This proposed development involves the demolition of 3 no. existing vacant dwellings on site, and the construction of 25 no. housing units. This commencement notice is for phase 1,being 8 houses, house numbers 1-8.
25 units · 1,216 m²Builder named
11 May 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
18 Aug 2022 · Latest notice
4 notices · phased
Kilkenny, Kilkenny · Kilkenny County Council · Planning ref 16/403
Residential Construction of 39 dwellings at Golf Links Road, Kilkenny
Notice identity Works stated Scale Commenced
CN0092604KK BCMS open-data feed
Construction of single-storey ESB substaion (78m2) at new nursing home development.
78 m²Builder not named
18 Aug 2022
CN0084633KK BCMS owner-supplied export
Nursing Home at Golf Links Road, with an internal floor area of 4542sqm with all associated site works and all ancillary services.
4,542 m²Builder named
22 Dec 2021
CN0040158KK BCMS owner-supplied export
Residential Construction of 39 dwellings at Golf Links Road, Kilkenny
39 units · 4,108.6 m²Builder named
15 Jun 2018
CN0039308KK BCMS owner-supplied export
Mixed use development at Walkin Street and Old Callan Road, Kilkenny including 15 apartments over 3 storeys.
15 units · 1,536 m²Builder named
23 May 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 Aug 2022 · Latest notice
3 notices · phased
Dublin 15, Dublin · Fingal County Council · Planning ref ABP-305980-19 & SHDW/021/19 (reactivated to ABP-309126-21)
Construction of 1 no. 5-storey apartment block BA01 (38 units of 1-, 2- and 3-bed with ground floor creche, gym, amenity room and security office) with precast panel walls and floors with masonry facing, balconies or terraces to all units. Also associated site works including new entrance at Balroy House, Carpenterstown Road, D15.
Notice identity Works stated Scale Commenced
SN0007532FL BCMS open-data feed
Erection of new freestanding MV Double substation and Switchroom to ESB specification with cavity brick-faced rc walls, rc slab and rc roof.
36.8 m²Builder not named
09 Aug 2022
CN0089428FL BCMS owner-supplied export
Construction of 1 no. 5-storey apartment block BA01 (38 units of 1-, 2- and 3-bed with ground floor creche, gym, amenity room and security office) with precast panel walls and floors with masonry facing, balconies or terraces to all units. Also associated site works including new entrance at Balroy House, Carpenterstown Road, D15.
38 units · 3,667.1 m²Builder named
13 May 2022
CN0089308FL BCMS owner-supplied export
Construction of 1no. 5-storey apartment block BA02 (41 units of 1-, 2- and 3-bed) with precast panel walls and floors with masonry facing, balconies or terraces to all units. Also associated site works including new entrance at Balroy House, Carpenterstown Road, D15.
41 units · 3,632.3 m²Builder named
11 May 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 Jul 2022 · Commenced
1 notice · 1 source identity
Killiney, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-311282-21
Churchview Road & Church Road, Killiney, Co. Dublin comprising the construction of 3 No. 3-6 storey apartment blocks (A; B; & C with part GF creche) over single-storey basements; 2 No. ESB sub-stations & associated site development works.
New build
29 Jul 2022 · Latest notice
2 notices · phased
Dublin · South Dublin County Council · Planning ref SDZ21A/0020
Construction of a residential building with 95 apartment units at Block G2 at Adamstown District Centre 2, Gollierstown, Adamstown, Lucan, Co. Dublin
Notice identity Works stated Scale Commenced
CN0092060SD BCMS owner-supplied export
Construction of a residential building with 89 apartment units at Block G1 at Adamstown District Centre 2, Gollierstown, Adamstown, Lucan, Co. Dublin
89 units · 7,773.7 m²Builder not named
29 Jul 2022
CN0092061SD BCMS owner-supplied export
Construction of a residential building with 95 apartment units at Block G2 at Adamstown District Centre 2, Gollierstown, Adamstown, Lucan, Co. Dublin
95 units · 7,727.9 m²Builder named
29 Jul 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.