Commencements / complete inventory / Ranked / relevance Index refreshed nightly · 28 Jul 2026

Complete commencement inventory

Every commencement project, and every notice underneath it

The full retained public-safe commencement history, grouped by planning authority and planning reference. Switch to Notices to inspect each source identity and phase separately.

138,265 Projects grouped by planning ref
153,613 Notice identities individual source notices
10,187 Multi-notice projects phased or revised starts
42,039 Named-builder notices builder stated on the notice
138,265 In this window All history · 153,613 notices
Filters Show / hide

Showing 326–350 of 138,265 projects

New build
26 Apr 2024 · Commenced
1 notice · 1 source identity

65 residential units and associated site development works

Enfield, Meath · Meath County Council · Planning ref 22/959

The construction of 65 residential units and associated site development works.
New build
24 Apr 2024 · Latest notice

41 no — Clonmel

Clonmel, Tipperary · Tipperary County Council · Planning ref 20/283 PL92.308934

Construction of 41 no. dwelling houses (no. 1-41) at Thomas Court, Thomas St., Clonmel, Co. Tipperary
New build
24 Apr 2024 · Latest notice

69 residential units, 47 Houses and 22 Duplex units P — Naas

Naas, Kildare · Kildare County Council · Planning ref 24/60029

Construction of 69 residential units, 47 Houses and 22 Duplex units P.A Reg. Ref. 24/60029.
New build
24 Apr 2024 · Latest notice

BLLOCK B - construction of Block B to contain 12no — Blackrock

Blackrock, Louth · Louth County Council · Planning ref 211032

BLLOCK B - construction of Block B to contain 12no. residential Units at The Loakers, Blackrock Road & Bothar Maol, Blackrock, Co. Louth
New build
24 Apr 2024 · Commenced
1 notice · 1 source identity

Commencement notice for the construction of 105 no — Enniscorthy

Enniscorthy, Wexford · Wexford County Council · Planning ref 20200440, 20211958

Commencement notice for the construction of 105 no. dwellings consisting of 42 no. 2-bedroom dwellings (unit type A01), 7 no. 2-bedroom dwellings (unit type B01), 8 no. 3 bedroom dwellings (unit type C01), 39 no. 3-bedroom dwellings (unit type D01), 9 no. 4-bedroom dwellings (unit type E01).
New build
24 Apr 2024 · Latest notice

House Nos — Enfield

Enfield, Meath · Meath County Council · Planning ref ABP 304296-19

House Nos. 17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37 and 38 The Avenue, Johnstown Rd., Royal Oaks, Enfield, Co. Meath
New build
23 Apr 2024 · Latest notice

75 — Kilkenny

Kilkenny, Kilkenny · Kilkenny County Council · Planning ref 21252

construction of 75. no residential dwellings, vehicular site entrance from Granges Rd, a shared pedestrian and cycle route through from Granges Road to Lousybusy Lane, boundary treatments, public open space, provision of foul and surface water connections/disposa l, and all associated site works.
New build
23 Apr 2024 · Latest notice

16 No — Dublin

Dublin, Dublin · Fingal County Council · Planning ref LRD0024/S3

Construction of 16 No. 2 & 3 Story houses, and associated site works
New build
23 Apr 2024 · Latest notice

This project involves the demolition of 4 no — Galway

Galway, Galway · Galway City Council · Planning ref ABP-310575-21

This project involves the demolition of 4 no. dwellings with associated outbuildings and construction of 102 no. residential units. Phase 1 of the works involves the construction of 12 no. houses, associated site works and demolition of 4 no. dwellings with associated outbuildings. The overall development consist of (13 no. houses, 34 no. duplex units and 55no. apartments), childcare facilities and associated site works.
New build
23 Apr 2024 · Commenced
1 notice · 1 source identity

A Residential Development consisting of 25No — Douglas

Douglas, Cork · Cork City Council · Planning ref P8.HP.22.06

Proposed Construction of a Residential Development consisting of 25No. Units and associated site works at Scairt, Greenvalley, Douglas, Cork
New build
23 Apr 2024 · Latest notice

Housing development in existing estate of Forthill — Aghnacliff

Aghnacliff, Longford · Longford County Council · Planning ref 1987

Construction of housing development in existing estate of Forthill
New build
23 Apr 2024 · Latest notice

21No — Cootehill

Cootehill, Cavan · Cavan County Council · Planning ref 22336

Construction of 21No. dwelling units connection to existing services and all ancillary works.
New build
23 Apr 2024 · Latest notice

33 - 60, Woodstream, Bailis, Navan, Co

Navan, Meath · Meath County Council · Planning ref 2121 ABP-311673-21

The construction of 33 - 60, Woodstream, Bailis, Navan, Co. Meath
New build
23 Apr 2024 · Latest notice

68 houses including work to common areas and infrastructure

Waterford, Waterford · Waterford City and County Council · Planning ref 18735

Construction of 68 houses including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
New build
23 Apr 2024 · Latest notice

Enabling Works • Demolition of the existing hotel buildings •

Dublin, Dublin · Fingal County Council · Planning ref ABP-313133-22

Enabling Works • Demolition of the existing hotel buildings • Demolition of the existing sports centre building • Local cut & fill earthworks to form access ramps and piling platforms • Installation of 2 sections of secant piled wall and temporary propping to retain ground • Bulk excavation and removal off site of approx. 70,000 cubic metres of sand and gravel material
New build
23 Apr 2024 · Latest notice

28 Houses at Former Carmelite Monastery Lands, Convent Road

Delgany, Wicklow · Wicklow County Council · Planning ref 21959

28 Houses at Former Carmelite Monastery Lands, Convent Road, Delgany, Co. Wicklow
New build
23 Apr 2024 · Latest notice

55 No — Kilternan

Kilternan, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-312214-21

Construction of 55 No. Three Storey Houses as part of development of 55 Houses and 75 Apartments
New build
22 Apr 2024 · Commenced
1 notice · 1 source identity

86 No — Kinsale

Kinsale, Cork · Cork County Council · Planning ref 225145

Construction of 86 No. dwelling houses at Glasheen & Park Laurence, Kinsale, Co. Cork
New build
22 Apr 2024 · Latest notice

66 houses including work to common areas and infrastructure

Waterford, Waterford · Waterford City and County Council · Planning ref 18734

Construction of 66 houses including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
New build
22 Apr 2024 · Commenced
1 notice · 1 source identity

74 dwellinghouses - 20 2 bed mid- terrace, 20 3 bed end terrace

Kerlogue, Wexford · Wexford County Council · Planning ref 20200939

74 dwellinghouses - 20 2 bed mid- terrace, 20 3 bed end terrace, 22 3 bed semi detached, 4 2 bed semi detached and 8 4 bed semi detached. Together with associated services installations and associated site development works at Kerlogue & Rocksborough Wexford
New build
22 Apr 2024 · Latest notice

69 houses and all associated site development works — Drogheda

Drogheda, Louth · Louth County Council · Planning ref 201084

Construction of 69 houses and all associated site development works.
New build
22 Apr 2024 · Latest notice

55 houses including work to common areas and infrastructure

Nenagh, Tipperary · Tipperary County Council · Planning ref 21959

Construction of 55 houses including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
New build
22 Apr 2024 · Latest notice

Mixed Housing Development and All Associated Site Works at

Tullamore, Offaly · Offaly County Council · Planning ref 22/523 ABP 317318-23

Construction of Mixed Housing Development and All Associated Site Works at Daingean Rd, Tullamore, Co. Offaly
New build
22 Apr 2024 · Latest notice

66 no — Clonsilla

Clonsilla, Dublin · Fingal County Council · Planning ref FW16A/0176/E1

Construction of 66 no. houses, part of a residential development known as Churchgate, permitted under planning permissions APB. PL06F.249188 and FW16A/0176/E1
New build
22 Apr 2024 · Latest notice

Phase 1 - Construction of 54 no — Bettystown

Bettystown, Meath · Meath County Council · Planning ref LB181385 and LB200998

Phase 1 - Construction of 54 no. dwellings and associated site works.

Counting and privacy. A notice identity is one public source-family/reference pair. Projects group only where canonical planning authority and planning reference match. Highest notice-stated units and floor area are shown; phases are never summed. Personal names, contact details, Eircodes and raw private addresses remain outside this public projection.